Billyoh 7ft Expert T & G Corner Summerhouse INS-0088 Building Instructions Download Page 1

Pressure Treated Buildings Only

"Do NOT treat for the first 6 months

following the delivery of your building"

V

3.8 - 010321

2)

Reacquaint

yourself with the

parts, QTy’s and

Sizes on the 

PACKING LIST.

PACKING

LIST

1) Take 5

minutes

and have

a coffee.

3)

Read the

instructions

thoroughly and

then re-read if

necessary.

BEFORE
YOU
START

7ft GABLE:

CoverED Size:

  7x7

CODE:

INS-0088

TONGUE & GROOVE

SUMMERHOUSE

7ft Expert T & G Corner Summerhouse Building Instructions

Please read the instructions carefully

and please retain for future 

r

eference

Please note that all images are for illustration purposes only.

For Queries and Help please contact Product Support: 

01909 768840

Pre - Treated

Pressure Treated

Summary of Contents for 7ft Expert T & G Corner Summerhouse INS-0088

Page 1: ...3 Read the instructions thoroughly and then re read if necessary BEFORE YOU START 7ftGABLE CoverED Size 7x7 CODE INS 0088 TONGUE GROOVE SUMMERHOUSE 7ft Expert T G Corner Summerhouse Building Instructi...

Page 2: ...tions to be thought of before constructing the building how to maintain your building upon completion This section is also aimed at ensuring you are aware of considerations such as location for constr...

Page 3: ...re positioned on a at level base raising the legs away from ground moisture Please read the Protecting Playhouse Tower Legs section of this document for more details Q Are my window plain panels inter...

Page 4: ...ng Woodkits contains all strips framing xings and Instruction for the building size Truss pack contains rafters and collar ties Where to nd everything HANDY TIP Sort xings and wood kit by size and pie...

Page 5: ...FR 0969 SQ 969 mm Place the corner post along the edge of the oor It should line up with edges of the oor Wall Panel Stages 1750 mm 38 1750 SQ Window Panel Fixing Stages S50 x 4 FR 0530 SQ 2ft Window...

Page 6: ...x 4 Pilot drill holes before xing S50 x 4 Pilot drill holes before xing Place the gable panel Left back S50 x 4 Pilot drill holes before xing Place the gable panel Right back S50 x 4 S50 x 4 Pilot dr...

Page 7: ...S50 x 4 Pilot drill holes before xing S50 x 4 1997 mm FI 1997 SQ135 S50 x 4 Fix the corner llet along the edge of the oor and window panel Pilot drill holes before xing 1997 mm FI 1997 SQ135 S50 x 4 R...

Page 8: ...g the Beading Fixing Door Glazing S50 Screw the wall panels to the oor Make sure it will hit the bearers S70 x 12 Apply a downward force from the roof so it will allign to the gable panel Hinges x to...

Page 9: ...Cardboad can be used to protect the the Beading PP x 16 GL x 1 Place the Glazing in the around the edges Fixing Window Glazing CL 1754 40RS 1754mm S30 x 11 S30 x 16 x 2 x 2 100mm Top Bottom Cloaking...

Page 10: ...m overhang at each end Tack to hold in place 100m m Felt Fixing Stage Length of roof 140mm x 3 Felt Felt Felt SideView 3 PIECES OF FELT STAGE 3 STAGE 1 STAGE 2 LENGTH CL 1907 40RS N30 1907mm Cloaking...

Page 11: ...80 90RS 1280mm Fascia Fixing Stage N30 x 8 FB 1280 90RS 1280mm Treat after assembly and annually to protect Protect your building 7x7 Picton Corner Summerhouse Shown 43 46 44 45 For Queries and Help p...

Page 12: ...139 28mm x 28mm Framing Rough Sawn Homegrown FR 0100 SQ 0 100 2 Top Bottom rails 25811 28mm x 28mm Framing Rough Sawn Homegrown FR 0530 SQ 0 530 12 Bottom Rails Gable 31768 28mm x 28mm Framing Rough S...

Page 13: ...r Block 29019 28mm x 28mm Framing Rough Sawn Homegrown FR 0100 SQ PT 0 100 2 Top Bottom rails 29020 28mm x 28mm Framing Rough Sawn Homegrown FR 0530 SQ PT 0 530 12 Bottom Rails Gable 29128 28mm x 28mm...

Page 14: ...wer Bolt Silver 2 HS Hasp and staple Padlock 1 PH6 6 INCH Plain Handle Silver 2 TB Turn Button Silver 2 FINAL PART CHECKING TO BE FILLED IN BY THE FINAL PACKER OR CHECKER I __________________________...

Page 15: ...81 2 Glazing 23024 Glazing 1 8mm Styrene Fixed Window W0 525xH1 278m 1 8STY 1 8STY FW 525x1278 1 Panel Pins 30mm Panel Pins P30 14 25722 Pack List FINAL PART CHECKING TO BE FILLED IN BY THE FINAL PACK...

Page 16: ...D SQ PT 0 510 2 Beading Sides 29103 PT Component Woodkit BD 1281D 10mm x 20mm Planed Beading 10x20PL BD20 1281D SQ PT 1 281 2 Glazing 23024 Glazing 1 8mm Styrene Fixed Window W0 525xH1 278m 1 8STY 1 8...

Page 17: ...6 SQ 1 276 4 Glazing 23025 Glazing 1 8mm Styrene Door W0 465xH1 275m 1 8STY 1 8STY DR 465x1275 2 Panel Pins 30mm Panel Pins P30 28 25723 Pack List FINAL PART CHECKING TO BE FILLED IN BY THE FINAL PACK...

Page 18: ...D SQ PT 0 449 4 Beading Sides 29100 PT Component Woodkit BD 1276D 10mm x 10mm Planed Beading 10x10PL BD10 1276D SQ PT 1 276 4 Glazing 23025 Glazing 1 8mm Styrene Door W0 465xH1 275m 1 8STY 1 8STY DR 4...

Reviews: