- Page 5 -
STEP THREE
—
Install platform C on side
braces B so that platform is fully seated within
inner channel on top of side braces.
STEP FOUR
—
Rotate the platform clips
into the engaged position.
PUSH
DISENGAGED
ENGAGED
STEP SIX
—
(When recommended or required) When platform height exceeds 4 ft., guard
railing is recommended, but is not required. However, OSHA requires guard rails for all platforms
10 ft. or higher. Install each guard rail panel (2 required) into sockets in side braces B and secure
with lock pin. Be sure that guard rail gate swings inward over the platform.
GUARD RAIL SOCKET
IN SIDE BRACE
STEP FIVE
—
Install 4 casters D into legs of end frames A and pin with snap pins E. Set brake
on each caster.
GUARD RAIL LEG
SIDE BRACE
PLATFORM
CHANNEL
• Recheck all side brace lock pins for full engagement and that the Saf-T-
Lok™ is in the locked position before accessing platform.
• Recheck platform to be sure it is properly seated within side brace channel
and the platform clips are fully engaged before accessing.
• When accessing platform, climb over top of end frame ladder — do not
swing around side of end frame.
WARNING
WARNING
Guard rail must be installed so that gate swings inward over platform. Failure
to install guard rail properly may result in serious injury or death!
Unique design allows the guard railing to stay at the platform level at all times.
Guard railing does not fit on the frame but in the sockets on the platform brace.
GUARD RAIL PANEL
Panel Guard - 1 unit shown
(2 required per work level)