
GUANGDONG ACES MACHINERY CO.,LTD
40
2.
Press
or
to change setting to -5.5
3.
Press
again to display [n_1]
4.
press
or
to change setting to -5.8
5.
press
again, target negative pressure will be between -5.6 to -5.7
e. Degasser N. Pres.
:
Maintain the vacuum condition for normal operation of
degasser, and if ink leakage occurs in the red circle of the figure below when in
normal working status, please contact our engineer immediately.
or