20-24
© 2005 Ver. 1 Fors MW Ltd
www.forsmw.com
34
5. MAINTENANCE / SPARE PARTS
5.1.
MAINTENANCE SCHEDULE
All kinds of maintenance work are subdivided into two groups: operating
(preventive) and compulsory (scheduled).
The need for operating maintenance is determined based on the results of
checking.
General
•
Maintenance works must be carried out regularly to ensure safe and
malfunction-free operations.
•
Maintenance works does not require any special tools. The user can
perform most of the operations.
•
Use correct tools.
•
Attempt to localize the defects as clearly as possible; you should have to
avoid opening the system unnecessarily.
•
Keep disassembled parts and repair area protected from dirt.
•
Keep spare parts in their packages until needed for installation.
•
Valve adjustments and repairs are recommended to be handled by service
personnel.
Daily inspections:
•
Examine visually the loader. Note defects and failures that might affect
safety. Repair possible defects and failures. Look carefully at the position
of the Towing eyelet.
•
Check so there is no leakages on hydraulic system, or damaged hoses.
•
Work through every function to its extreme position.
•
Check the oil level.
Weekly maintenance:
•
Clean the trailer regularly with sponge and soap.
•
When cleaning never use hot water under high pressure, it will remove the
grease from bearings.
•
Check the operation of the device.
•
Check hydraulic pressure.
•
Check the brake condition.
•
Control wheel nut tightness. When tightening the locking force must be
40-45 kpm.
•
Check the lights, reflectors and bulbs.
Monthly maintenance:
•
Check the air pressure in tires.