
P a g e
|
6
Pedestal Installation
!
!
After fitting the box to the gooseneck,
re-fit the module and connect a
14
gauge
earth wire to the earth terminal.
3
Earth Rod
(close as
possible)
Maintain manufacturer’s
warranty by adhering to the
guidelines shown. Use 110v
surge protected supply.
Surge protected 110v
4
24v dc PSU
16 gauge
MIN
1
25 feet
MAX
Call box
2
Remove 4 screws
and remove power
conditioning module
(if needed)
Use minimum
16 gauge
wire
from the 24v dc adaptor provided
to the terminals shown.
12v
installs should use SOLAR
input terminals.
Summary of Contents for CELLPRIM4GE
Page 35: ...P a g e 35...