7.6.7 Risks arising from functional verification of the machine
Correct functionality of all of the machine’s driving and safety devices is verified together with
the correct movement of the machine itself.
For this operation, all the documents pertaining to the configuration together with the Use and
Maintenance Instruction Manual of the machine must be consulted.
Possible risks:
— errors in the assembly process or in the electrical connection
— falling material or equipment
— incorrect adjustment for the downward motion of the machine
Prevention and safety measures:
—
all personnel designated to the assembly process must be qualified and must be
perfectly aware of the procedures given in the Instruction Manual of the machine. All
the functions of the normal drive must be verified, starting from the simpler operations
and proceeding onto the more complex ones
7.6.8
Risks arising from the machine’s normal operation
The machine is used for normal operation in the construction site.
For this operation, the Use and Maintenance Instruction Manual of the machine must be
consulted.
Possible risks:
— the machine is overloaded
— material or equipment fall when work is being carried out
— the machine stops working due to a power failure
— an anchor loosens
— the machine stops working due to a failure in the unit
Prevention and safety measures:
— all personnel designated to the machine’s functionality must be qualified and must be
perfectly aware of the procedures given in the Instruction Manual of the machine. The
site manager must supervise the loading operations, ensuring not to overload the
machine
—
if a power failure occurs, the safety manager must be immediately informed and he will
see to organizing the necessary interventions to restore the working conditions
—
the anchors must be checked periodically, especially after particularly intense weather
conditions, under the supervision of the safety manager
— if a failure is verified in the unit, the safety manager must be informed and under his
supervision the defect is to be repaired by the maintenance personnel or by BETA
MAX Technical Support
Summary of Contents for MAXIAL TRACK HOIST
Page 2: ......
Page 117: ......
Page 118: ......
Page 121: ......
Page 122: ......
Page 123: ......
Page 124: ......
Page 127: ......
Page 128: ......
Page 129: ......
Page 130: ......
Page 131: ......
Page 132: ......
Page 133: ......
Page 134: ......
Page 137: ......
Page 138: ......
Page 139: ......
Page 140: ......
Page 141: ......
Page 142: ......
Page 143: ......
Page 144: ......
Page 145: ......
Page 146: ......
Page 149: ......
Page 150: ......
Page 153: ......
Page 154: ......
Page 157: ......
Page 158: ......
Page 159: ......
Page 160: ......