
Service and Maintenance for Cylindrical Locks
W Series Service Manual
5–27
3. Remove the through-bolts and the RQE rose liner.
Reinstalling the RQE rose liner
1. Place the RQE rose liner on the chassis, aligning the holes in the
rose liner with the holes prepared in the door.
Caution
Make sure that there is clearance for the solenoid wire between
the RQE rose liner and the door.
2. Install the through-bolts through the RQE rose liner and door in the
top and bottom holes.
3. Tighten the RQE rose liner on the door with the through-bolts.
4. Connect the RQE connector.
5. For IDH Max Locks
■
Reinstall the inside hub washer.
■
Reinstall the upper and lower escutcheon screws on the inside
escutcheon.
■
Reinstall the inside lever/knob. See
Task H. To reinstall the inside
■
Reinstall the access door. See
Task J. To reinstall the access door:
Figure 5.32
Removing and reinstalling the RQE rose liner (IDH Max shown)
RQE rose liner
Through-bolt
RQE wire
Solenoid wire
Inside of door
RQE rose liner
Hub washer
Summary of Contents for 34HW
Page 1: ......
Page 6: ...Contents vi W Series Service Manual...
Page 38: ...IDH Max Locks Functions and Parts 2 24 W Series Service Manual...
Page 54: ...Electrified Locks Functions and Parts 3 16 W Series Service Manual...
Page 140: ...Service and Maintenance for Cylindrical Locks 5 30 W Series Service Manual...
Page 158: ...Additional Service and Maintenance for IDH Max Locks 6 18 W Series Service Manual...
Page 162: ...Glossary A 4 W Series Service Manual...
Page 164: ...Installation Instructions B 2 W Series Service Manual...