![BERTHOLD TECHNOLOGIES Uni-Probe LB 490 User Manual Download Page 190](http://html1.mh-extra.com/html/berthold-technologies/uni-probe-lb-490/uni-probe-lb-490_user-manual_2739276190.webp)
38477BA2B
2 – 190
25.5.09
3 Electrical Installation
Volume 2
1. Capacitor-buffered real-time clock
2. Slide switch for current output
With this slide switch you can choose whether power is gener-
ated by the current output or supplied by an external source.
Move slide switch to the left: current output is passive Move
slide switch to the right: current output is active Versions with
intrinsically safe current output may not be switched over, since
the connected buffer amplifier serves as current output to the
control system. See chapter "3.5 Uni-Probe with Ex i Current
Output".
3. Slide switch for the termination resistor in a RS-485 connec-
tion.
The RS-485 connection is used in multi-detector systems to
connect the Main Unit with the Auxiliary Units. Always at the
beginning and at the end the RS -485 has to be terminated with
120 Ohm, i.e., at the first and the last detector the resistor has
to be enabled.
Down: resistor is enabled
Up: resistor is disabled.
4. RS-232 interface
Used to update the embedded software in the Uni-Probe. See
chapter "4.13 Updating the Embedded Software in the
Uni-Probe".
5. Slide switch for communication
If the slide switch is set to “Auto”, the bus module (Profibus PA
or FOUNDATION
™
Fieldbus) is identified automatically and
communication is switched over to the bus module. If the bus
module is not plugged in, HART
®
is automatically enabled.
If the slide switch is set to “forced HART”, then only communi-
cation via the HART
®
interface is possible, regardless of
whether the bus module has been installed or not.
up: HART
®
fixed
down: automatic detection
6. Reset button
Push the Reset button to reset the Uni-Probe. The effect is the
same as if the power supply has been turned off for a short
time and turned on again.
Signal cable with shielding
We recommend using a screened cable for the HART
®
current out-
put and also for Profibus and fieldbus signal outputs.
The screen has to be connected to the grounding screw in the con-
nection box of the Uni-Probe. If potential differences can be ruled
out, the screen can be connected on both sides. In the multi-detec-
tor mode, the screen for the RS-485 connection cable has to be
connected to terminal 56.
Terminal resistance
In case of cascading several detectors (multi-detector mode), the
first and the last Uni-Probe that is connected to the Uni-Probe
RS-485 interface has to be terminated by a resistor (see Figure 3-3
and Figure 3-4).
Summary of Contents for Uni-Probe LB 490
Page 2: ......
Page 17: ...1 g l Time 0 00 10 30 11 00 11 3012 00 12 30 Volume 1 Safety Manuals...
Page 18: ...38477BA2B 1 18 25 5 09 Volume 1...
Page 22: ...38477BA2B 1 22 25 5 09 1 About this User s Manual Volume1...
Page 28: ...38477BA2B 1 28 25 5 09 4 Transport and Assembly Volume1...
Page 44: ...38477BA2B 1 44 25 5 09 6 Radiation Protection Volume1...
Page 56: ...38477BA2B 1 56 25 5 09 7 Source Replacement Volume1...
Page 82: ...38477BA2B 1 82 25 5 09 9 Functional Safety Volume1...
Page 90: ...38477BA2B 1 90 25 5 09 11 Certificates Volume1...
Page 91: ...Uni Probe LB 490 BERTHOLD TECHNOLOGIES GmbH Co KG 1 91 Volume 1 11 Certificates 1...
Page 92: ...38477BA2B 1 92 25 5 09 11 Certificates Volume1...
Page 93: ...Uni Probe LB 490 BERTHOLD TECHNOLOGIES GmbH Co KG 1 93 Volume 1 11 Certificates 1...
Page 94: ...38477BA2B 1 94 25 5 09 11 Certificates Volume1...
Page 95: ...Uni Probe LB 490 BERTHOLD TECHNOLOGIES GmbH Co KG 1 95 Volume 1 11 Certificates 1...
Page 96: ...38477BA2B 1 96 25 5 09 11 Certificates Volume1...
Page 97: ...Uni Probe LB 490 BERTHOLD TECHNOLOGIES GmbH Co KG 1 97 Volume 1 11 Certificates 1...
Page 98: ...38477BA2B 1 98 25 5 09 11 Certificates Volume1...
Page 99: ...Uni Probe LB 490 BERTHOLD TECHNOLOGIES GmbH Co KG 1 99 Volume 1 11 Certificates 1...
Page 100: ...38477BA2B 1 100 25 5 09 11 Certificates Volume1...
Page 101: ...Uni Probe LB 490 BERTHOLD TECHNOLOGIES GmbH Co KG 1 101 Volume 1 11 Certificates 1...
Page 102: ...38477BA2B 1 102 25 5 09 11 Certificates Volume1...
Page 103: ...Uni Probe LB 490 BERTHOLD TECHNOLOGIES GmbH Co KG 1 103 Volume 1 11 Certificates 1...
Page 104: ...38477BA2B 1 104 25 5 09 11 Certificates Volume1...
Page 105: ...Uni Probe LB 490 BERTHOLD TECHNOLOGIES GmbH Co KG 1 105 Volume 1 11 Certificates 1...
Page 106: ...38477BA2B 1 106 25 5 09 11 Certificates Volume1...
Page 107: ...Uni Probe LB 490 BERTHOLD TECHNOLOGIES GmbH Co KG 1 107 Volume 1 11 Certificates 1...
Page 108: ...38477BA2B 1 108 25 5 09 11 Certificates Volume1 11 2 FM Certificate...
Page 109: ...Uni Probe LB 490 BERTHOLD TECHNOLOGIES GmbH Co KG 1 109 Volume 1 11 Certificates 1...
Page 112: ...38477BA2B 1 112 25 5 09 11 Certificates Volume1 11 4 EG Declaration of Conformity...
Page 115: ...Uni Probe LB 490 BERTHOLD TECHNOLOGIES GmbH Co KG 1 115 Volume 1 1 Notes...
Page 117: ...1 g l Time 0 00 10 30 11 00 11 3012 00 12 30 Volume 2 Uni Probe Installation...
Page 118: ...38477BA2B 2 118 25 5 09 Volume 2...
Page 138: ...38477BA2B 2 138 25 5 09 1 System Description Volume2...
Page 254: ...38477BA2B 2 254 25 5 09 6 Technical Drawings Volume2 6 2 Rod Detector...
Page 286: ...38477BA2B 2 286 25 5 09 6 Technical Drawings Volume2 6 10 Shielding for Rod Source on Dip Tube...
Page 288: ...38477BA2B 2 288 25 5 09 6 Technical Drawings Volume2...
Page 292: ...38477BA2B 2 292 25 5 09 7 Cooling Water Curves Volume2...
Page 293: ...Uni Probe LB 490 BERTHOLD TECHNOLOGIES GmbH Co KG 2 293 Volume 2 2 Notes...
Page 295: ...1 g l Time 0 00 10 30 11 00 11 3012 00 12 30 Volume 3 HART Communicator User Interface...
Page 296: ...38477BA2B 3 296 25 5 09 Volume 3...
Page 340: ...38477BA2B 3 340 25 5 09 3 Getting Started via the HART Communicator Volume3...
Page 403: ...Uni Probe LB 490 BERTHOLD TECHNOLOGIES GmbH Co KG 3 403 Volume 3 3 Notes...
Page 405: ...1 g l Time 0 00 10 30 11 00 11 3012 00 12 30 Volume 4 PACTware User Interface FDT DTM...
Page 406: ...38477BA2B 4 406 25 5 09 Volume 4...
Page 408: ...38477BA2B 4 408 25 5 09 1 PC Connection to the Uni Probe Volume4...
Page 416: ...38477BA2B 4 416 25 5 09 2 Installing and Working with DTM Volume4...
Page 417: ...Uni Probe LB 490 BERTHOLD TECHNOLOGIES GmbH Co KG 4 417 Volume 4 4 Notes...
Page 419: ...1 g l Time 0 00 10 30 11 00 11 3012 00 12 30 Volume 5 SIMATIC PDM User Interface HART...
Page 422: ...38477BA2B 5 422 25 5 09 1 Hardware Configuration Volume5...
Page 490: ...38477BA2B 5 490 25 5 09 4 Menu Overview Volume5...
Page 512: ...38477BA2B 5 512 25 5 09 5 Calibration with SIMATIC PDM Volume5...
Page 526: ...38477BA2B 5 526 25 5 09 7 Working with SIMATIC PDM Volume5...
Page 542: ...38477BA2B 5 542 25 5 09 8 Explanations Volume5...
Page 550: ...38477BA2B 5 550 25 5 09 9 Error Handling Volume5...
Page 551: ...Uni Probe LB 490 BERTHOLD TECHNOLOGIES GmbH Co KG 5 551 Volume 5 5 Notes...
Page 553: ...1 g l Time 0 00 10 30 11 00 11 3012 00 12 30 Volume 6 SIMATIC PDM User Interface Profibus PA...
Page 600: ...38477BA2B 6 600 25 5 09 3 Device specific Menus Volume6...
Page 624: ...38477BA2B 6 624 25 5 09 4 Calibration with SIMATIC PDM Volume6...
Page 648: ...38477BA2B 6 648 25 5 09 6 Explanations Volume6...
Page 654: ...38477BA2B 6 654 25 5 09 7 Error Handling Volume6...
Page 655: ...Uni Probe LB 490 BERTHOLD TECHNOLOGIES GmbH Co KG 6 655 Volume 6 6 Notes...
Page 657: ...1 g l Time 0 00 10 30 11 00 11 3012 00 12 30 Volume 7 FOUNDATION Fieldbus User Interface...
Page 664: ...38477BA2B 7 664 25 5 09 2 Installation Program Start Volume7...
Page 672: ...38477BA2B 7 672 25 5 09 3 Parameter Overview Volume7...
Page 688: ...38477BA2B 7 688 25 5 09 4 Calibration with FOUNDATION Fieldbus Volume7...
Page 700: ...38477BA2B 7 700 25 5 09 5 Functional Processes Volume7...
Page 720: ...38477BA2B 7 720 25 5 09 7 Error Handling Volume7...
Page 721: ...Uni Probe LB 490 BERTHOLD TECHNOLOGIES GmbH Co KG 7 721 Volume 7 7 Notes...
Page 728: ...Index Volume 1 7 38477BA2B I 728 25 5 09...
Page 729: ...Uni Probe LB 490 BERTHOLD TECHNOLOGIES GmbH Co KG 729 Volume 1 7 Notes...