Menu Structure
Volume 3
2.60
Error Status
Menu path:
Diagnostic
Operating Status
Error Status
.
1 Meas Setup Status
Displays the status of the calibration parameters. The status is
updated after each decay compensation (at 09:01 h) and after each
date change. It informs you that the measurement is still working
safely. One of the following status messages is displayed:
–
0-OK
The calibration carried out is OK.
–
1-ERROR BACKGROUND
The count rate of the background radiation is higher than that
for the calibration points for empty or full (
Cal Point 0%
or
Cal
Point 100%
).
–
2-ERROR NOT SORTED
The calibration points are not entered in sequence and need to
be sorted.
–
3-ERROR CURVE NOT MONOTONOUS
Not all count rates are decreasing with increasing level.
–
4-ERROR MISSING CALIBRATION POINT
There is a calibration point with indication of the value in % but
without count rate.
–
5-COMPENSATION ERROR
A gas density compensation at exponential characteristic curve
is not possible.
–
6-DATE ERROR
A date is still set to the default value of 1.1.2000. At
Calibrate
,
check the
Date
parameter. At
Restore
, check the date in
Restore Date
.
–
7-CHECK ERROR
The status of the calibration parameters could not be fully veri-
fied. In this case, repeat the calibration. If the error occurs
again, replace the detector, at least the detector electronics.
Summary of Contents for LB 480
Page 2: ......
Page 11: ...1 g l Time 0 00 10 30 11 00 11 3012 00 12 30 Volume 1 Safety Manual...
Page 12: ...54733 10BA2L 1 12 02 2017 Volume 1...
Page 22: ...54733 10BA2L 1 22 02 2017 4 Transport and Assembly Volume 1...
Page 56: ...54733BA26 1 56 02 2017 5 Explosion Protection Volume 1...
Page 57: ...SENSseries LB 480 BERTHOLD TECHNOLOGIES GmbH Co KG 1 57 Volume 1 5 Explosion Protection 1...
Page 58: ...54733BA26 1 58 02 2017 5 Explosion Protection Volume 1...
Page 59: ...SENSseries LB 480 BERTHOLD TECHNOLOGIES GmbH Co KG 1 59 Volume 1 5 Explosion Protection 1...
Page 60: ...54733BA26 1 60 02 2017 5 Explosion Protection Volume 1...
Page 61: ...SENSseries LB 480 BERTHOLD TECHNOLOGIES GmbH Co KG 1 61 Volume 1 5 Explosion Protection 1...
Page 62: ...54733BA26 1 62 02 2017 5 Explosion Protection Volume 1...
Page 63: ...SENSseries LB 480 BERTHOLD TECHNOLOGIES GmbH Co KG 1 63 Volume 1 5 Explosion Protection 1...
Page 64: ...54733BA26 1 64 02 2017 5 Explosion Protection Volume 1...
Page 66: ...54733BA26 1 66 02 2017 5 Explosion Protection Volume 1...
Page 67: ...SENSseries LB 480 BERTHOLD TECHNOLOGIES GmbH Co KG 1 67 Volume 1 5 Explosion Protection 1...
Page 68: ...54733BA26 1 68 02 2017 5 Explosion Protection Volume 1...
Page 69: ...SENSseries LB 480 BERTHOLD TECHNOLOGIES GmbH Co KG 1 69 Volume 1 5 Explosion Protection 1...
Page 70: ...54733BA26 1 70 02 2017 5 Explosion Protection Volume 1...
Page 71: ...SENSseries LB 480 BERTHOLD TECHNOLOGIES GmbH Co KG 1 71 Volume 1 5 Explosion Protection 1...
Page 72: ...54733BA26 1 72 02 2017 5 Explosion Protection Volume 1...
Page 73: ...SENSseries LB 480 BERTHOLD TECHNOLOGIES GmbH Co KG 1 73 Volume 1 5 Explosion Protection 1...
Page 108: ...54733 10BA2L 1 108 02 2017 7 Functional Safety Volume 1 7 13 Functional Safety Certificate...
Page 110: ...54733 10BA2L 1 110 02 2017 7 Functional Safety Volume 1...
Page 112: ...54733 10BA2L 1 112 02 2017 8 Visual Inspection Volume 1...
Page 128: ...54733 10BA2L 1 128 02 2017 9 Radiation Protection Volume 1...
Page 147: ...SENSseries LB 480 Level measurement BERTHOLD TECHNOLOGIES GmbH Co KG 1 147 Volume 1 1 Notes...
Page 149: ...1 g l Time 0 00 10 30 11 00 11 3012 00 12 30 Volume 2 Installing SENSseries...
Page 150: ...54733 10BA2L 2 150 02 2017 Volume 2...
Page 170: ...54733 10BA2L 2 170 02 2017 1 System Description Volume 2...
Page 240: ...54733 10BA2L 2 240 02 2017 4 Repair Maintenance and Upkeep Volume 2...
Page 288: ...54733 10BA2L 2 288 02 2017 5 Technical Information Volume 2...
Page 297: ...SENSseries LB 480 Level measurement BERTHOLD TECHNOLOGIES GmbH Co KG 2 297 Volume 2 2 Notes...
Page 299: ...1 g l Time 0 00 10 30 11 00 11 3012 00 12 30 Volume 3 Operation with HART Communicator...
Page 300: ...54733 10BA2L 3 300 02 2017 Volume 3...
Page 390: ...54733 10BA2L 3 390 02 2017 3 Getting Started via the HART Communicator Volume 3...
Page 410: ...54733 10BA2L 3 410 02 2017 6 Functional Processes Volume 3...
Page 428: ...54733 10BA2L 3 428 02 2017 7 Explanations Volume 3...
Page 440: ...54733 10BA2L 3 440 02 2017 8 Error Handling Volume 3...
Page 444: ...54733 10BA2L 3 444 02 2017 9 Setup Protocol Volume 3 Path Parameters Unit Standard SETUP...
Page 445: ...SENSseries LB 480 Level measurement BERTHOLD TECHNOLOGIES GmbH Co KG 3 445 Volume 3 3 Notes...
Page 449: ...SENSseries LB 480 Level measurement BERTHOLD TECHNOLOGIES GmbH Co KG 1 449 Volume 1 Notes...