USER HANDBOOK 1.0 | B-PRIMIS ET-PRO SERIES
Berghof Automation GmbH | Arbachtalstrasse 26 | 72800 Eningen | Germany | www.berghof-automation.com
S_B-Primis_ET-Pro_DE_1_0_EN_neu.docx
30
4.2.3. ET-Pro 15 installation
Fig. 18: Installing in the installation cut-out
Prerequisites:
→
The tensioning clamps are not attached to the device.
5th
Making sure the alignment is correct, push the device evenly into the installation cut-out.
6th
Make sure that the device is lying flush all round.
Fig. 19: Hooking in the tensioning clamps (at the rear)
7th
Attach the device with 2 tensioning clamps: Hook in the tensioning clamps diagonally opposite
each other on the cover and tighten the screws slightly.