
14
Bentone
172 515 05 2018-01-02
4.5 Skeleton diagrams
1.
Ball valve
2. Filter
3. Governor
4.
Pressure gauge with shut-off cock
5a.
Gas pressure switch, mini
5b.
Gas pressure switch, maxi
6a.
Main valve, 2 -stage. When modulaing operation is required this
valve is equipped with controls for variable opening.
6b.
Safety valve
1)7.
Valve proving system
9.
Air pressure switch
10.
Gas burner control
Pos. 5b, 7: Components not required according to EN 676.
1)
Required over 1200 kW according to EN 676.hhh
Summary of Contents for BG 650
Page 2: ...2 Bentone...
Page 19: ...19 Bentone 4 10 Gas nozzle 45 Natural gas Propan Biogas UV detector...
Page 38: ...38 Bentone 9 2 Wiring diagram LME Design without A3 AGQ Option...
Page 45: ...172 905 04 2018 02 15 12 EU Declaration of conformity Bentone Gasburners...
Page 48: ...Enertech AB P O Box 309 SE 341 26 Ljungby www bentone se www bentone com...