The list is displayed of some messages which are shown on the display in the event of an operating anomaly:
Amp1
Motor 1 obstacle error/anti-crushing
Check the presence of obstacles on the stroke of the motor gate 1
Amp2
Motor 2 obstacle error/anti-crushing
Check the presence of obstacles on the stroke of the motor gate 2
ENC1
Encoder 1 error/obstacle detection
Check correct connection of the encoder of motor 1 to the control panel,
the presence of obstacles on the stroke of the gate and correct operation
of the encoder.
ENC2
Encoder 2 error/obstacle detection
Check correct connection of the encoder of motor 2 to the control panel,
the presence of obstacles on the stroke of the gate and correct operation
of the encoder.
ERR
AUTOSET error
Repeat autoset procedure
Err1
Motor 1 circuit test error
Check motor 1 connections. Motor disconnected or not working. Problem
on control panel
Err2
Motor 2 circuit check error
Check motor 2 connections. Motor disconnected or not working. Problem
on control panel
Err4
PHOTA photocell test error
Check connections, alignment of the photocell PHOT OP or obstacles
present.
Err5
PHOTC photocell test error
Check connections, alignment of the photocell PHOT LC or obstacles
present.
Err8
Inputs enabling error
During the autoset phase, an input activated (START/PP/Open/Close/PED)
or one of the buttons (+/-/PG) activated. Repeat the autoset procedure.
BAR
BAR input intervention (sensitive edge)
During the manoeuvre, the sensitive edge detected an obstacle.
thrm
Motor thermal switch safety device interven-
tion
Overheating due to permanent obstacles. Release the gate and check
there are no friction points.
ovd1
Overload M1
Maximum power exceeded. Check motor or presence of friction.
ovd2
Overload M2
Maximum power exceeded. Check motor or presence of friction.
MAINTENANCE
The following table is used to record maintenance operations, improvement or repair works carried out by the expert engineer.
Date _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _
Engineer's Signature _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _
Stamp
Description of operation
_ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _
_ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _
Date _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _
Engineer's Signature _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _
Stamp
Description of operation
_ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _
_ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _
Date _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _
Engineer's Signature _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _
Stamp
Description of operation
_ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _
_ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _
Date _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _
Engineer's Signature _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _
Stamp
Description of operation
_ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _
_ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _
Summary of Contents for SAM
Page 2: ......