- 3 -
Table of contents
9.1 General instructions ...................................................................................................................
…..26
9.2 Cleaning the tubular aeration rotary chamber ...........................................................................
…..26
9.3 Setting up airflow into the furnace .................................................................................................. 28
9.4 Lubricating furnace bearings .......................................................................................................... 29
Declaration of Conformity for K14, K20 and K25 boilers ....................................................................... 41
Summary of Contents for K14
Page 1: ...BOILER OPERATION AND INSTALLATION GUIDE BENEKOV K14 BENEKOV K20 BENEKOV K25 ...
Page 9: ... 9 Fig 3 BENEKOV K14 boiler basic dimensions ...
Page 10: ... 10 Fig 4 BENEKOV K20 and K25 boiler dimensions ...
Page 17: ... 17 Fig 7 Position of the K14 boiler in a boiler room ...
Page 33: ... 33 Fig 17 Diagram of electrical connection of XS20 burner of the K14 boiler ...
Page 34: ... 34 Fig 18 Diagram of electrical connection of XS26 burner of the K20 and K25 boilers ...