
16
STEP 9
(
Installing the Safeties and Safety Cable )
1. Install Safety Weldments into each respective
Column. (See Figs 9.1 & 9. 2.).
2. From the offside Column insert the non looped end
of the Safety Cable through the hole located to the right of
the Offside Safety Weldment. (See Fig. 9.3)
3. Route the Cable under the Pulley and take it up to the
Top Trough. (See Fig. 9.4)
DANGER !
ENSURE THAT BOTH THE
POWERSIDE & OFFSIDE SAFETIES ENGAGE
PROPERLY PRIOR TO LIFT OPERATION.
Fig. 9.1
Fig. 9.2
Fig. 9.3
Fig. 9.4.
Summary of Contents for XPR-7TR
Page 11: ...11 FLOORPLAN CAPACITY MODEL XPR 7TR Dim A 3683mm 145 CAPACITY 7 000 Lbs ...
Page 12: ...12 MAIN ASSEMBLY VIEW ...
Page 24: ...24 ...
Page 28: ......
Page 31: ...31 OPTIONAL EQUIPMENT INSTALLATION ...
Page 35: ...35 ...
Page 36: ...36 ...
Page 47: ...47 ...