Connect To Power
Connect the Power Unit to an appropriate Power Source through the Power Disconnect Switch.
Power for this Lift is 220 VAC, 60 Hz. single phase and should be protected by a 25 Amp fuse or
circuit breaker.
Refer to the
and
Control Console Wiring Diagram
⚠
DANGER
All wiring
must
be performed by a licensed, certified Electrician in accordance with
all applicable national and local electrical codes. Do not perform any maintenance
or installation on the Lift without first making sure that main electrical power has
been disconnected from the Lift and cannot be re-energized until all procedures are
complete.
⚠
WARNING
Keep Wiring and Hydraulic Hoses away from sharp edges or pinch points to avoid
damage.
Important Electrical Information:
•
Improper electrical installation can damage the Power Unit Motor. This damage is
not
covered
under warranty.
•
Use a separate Circuit Breaker for each Lift Installed.
•
Protect each circuit with a 25 Amp time-delay fuse or circuit breaker.
To connect the Lift to Power
:
Verify the Power is disconnected and locked out to prevent re-energizing while you work on the
Lift.
Connect the Main Power Supply wiring to the Power Disconnect Switch just installed using an
appropriate gauge wire for the voltage, current and length of run.
Route the Power wiring from the Power Disconnect up to the Junction Box on the Power Unit.
and
Control Console Wiring Diagram
to the Contactor and Thermal Disconnect, the Solenoid, and Control Console in the Junction Box.
Wire the Power Unit Junction Box
The Junction Box houses the wiring and connections for Power, Thermal Overload, Limit Switch,
Solenoid and the Lift Controls.The Controls on the Console allow the operator to raise and lower
Vehicles. Refer to the figure above and the
⚠
DANGER
All wiring
must
be performed by a licensed, certified Electrician in accordance with
all applicable national and local electrical codes.
The Junction Box wiring includes:
•
Power
. Wiring connections for power supplied to the Hydraulic Power Unit from the Power
Disconnect Switch.
•
Control Console
. This wiring includes the Up, Down and Emergency Stop Lift functions.
•
Limit Switch
. This Switch stops the upward motion of the Lift Platform.
•
Solenoid
. The Solenoid opens the Hydraulic Valve allowing the Lift Platform to Lower.
Summary of Contents for PL-6000DC
Page 12: ...PL 6000DC Two Post Parking Lift 12 P N 5900273 Rev A1 May 2022 Typical Height Requirements ...
Page 20: ...PL 6000DC Two Post Parking Lift 20 P N 5900273 Rev A1 May 2022 Drawing not to scale ...
Page 31: ...PL 6000DC Two Post Parking Lift 31 P N 5900273 Rev A1 May 2022 Drawing not to scale ...
Page 70: ...PL 6000DC Two Post Parking Lift 70 P N 5900273 Rev A1 May 2022 Drawing not to scale ...
Page 73: ...PL 6000DC Two Post Parking Lift 73 P N 5900273 Rev A1 May 2022 Labels ...
Page 74: ...PL 6000DC Two Post Parking Lift 74 P N 5900273 Rev A1 May 2022 ...
Page 75: ...PL 6000DC Two Post Parking Lift 75 P N 5900273 Rev A1 May 2022 ...
Page 80: ...PL 6000DC Two Post Parking Lift 80 P N 5900273 Rev A1 May 2022 ...
Page 84: ...PL 6000DC Two Post Parking Lift 84 P N 5900273 Rev A1 May 2022 Maintenance Log ...
Page 85: ...PL 6000DC Two Post Parking Lift 85 P N 5900273 Rev A1 May 2022 Maintenance Log ...
Page 86: ...PL 6000DC Two Post Parking Lift 86 P N 5900273 Rev A1 May 2022 Maintenance Log ...
Page 87: ...PL 6000DC Two Post Parking Lift 87 P N 5900273 Rev A1 May 2022 Maintenance Log ...