37
TM800_D00165_00_M_XXEN/06.2015
5. Commissioning and testing
Start commissioning according to the following commissioning pattern:
1. Tests before switching on
2. Tests after switching on
3. Set parameters (parameterisation)
4. Settings at the TM800
5. Settings in the TMK-SET software
6. Tests after parameter setting
Write down all settings and keep it together with the device and installation doc-
umentation.
When setting the TM800 with the configuration softwareTMK-SET, a project file
will be created. Save this file. Create a backup copy of this file and keep it in a safe
place.