System description
16
EDS309x_D00012_03_M_XXEN/11.2014
3.3.1
Schematic diagram EDS system
3.3.2
Test cycle
The locating current pulse cycle has a duration of 6 seconds. The PGH… sends alternating positive
and negative locating current pulses. The sketch below shows the test cycle of the PGH… with the
different switch settings (1, 2, 3) on the device, see schematic diagram above.
EDS195P
Insulation fault locator
PGH…
Locating current injector
U
n
IT system voltage
PSA…
Measuring clamp
R
F
Insulation fault
PE
Protective earth conductor
U
n
IT-System
PSA...
EDS195P
PGH...
PE
R
F
L2(L-)
L1(L+)
2
3
1
EDS Start
Position
PGH...
1
2
3
3
1
2 sec
4 sec
2 sec
4 sec
Summary of Contents for EDS3090
Page 6: ...Table of Contents 6 EDS309x_D00012_03_M_XXEN 11 2014...
Page 26: ...Considerations prior to use 26 EDS309x_D00012_03_M_XXEN 11 2014...
Page 62: ...Frequently Asked Questions 62 EDS309x_D00012_03_M_XXEN 11 2014...
Page 65: ......
Page 66: ......
Page 67: ......