Installation, connection and commissioning
23
VMD460-NA_D00001_05_M_XXEN/01.2020
4. Installation, connection and commissioning
4.1 Unpacking
•
Unpack all the parts supplied with the system. Do not use sharp-edged tools that may
damage the content of the packaging.
•
Compare your order with our delivery note to check that you have received all products
in full. The article numbers and type designation printed on the nameplates provides an
easy means of uniquely identifying each device.
•
Check all parts supplied for any evidence of damage in transit.
•
Devices damaged in transit must not be used. If a device has sustained damage, please
contact Bender. Details of who to contact are indicated on the delivery document.
•
When storing the devices in an environment where the temperature is wintry and cold:
Leave the devices to stand for 3 to 4 hours at room temperature before connecting the
power supply. When the devices are moved from a cold to a warm environment, con-
densation will be evident on all parts. Putting damp devices into operation may dam-
age electrical components and there is a danger of electric shock on contact.
4.2 Fuses
Equip the supply voltage of all system ‐components with fuses. IEC 60364-4-473 re-
quires protective devices to be used to protect the component in the event of a short
circuit. We recommend the use of 6 A fuses.
Danger of electric shock!
Make sure that the installation area is
disconnected from any electrical
source .
Consider the data on
the rated voltage and supply voltage
as specified
in the technical data!
DANGER