![Bender ATICS UMA710-2-63-ISO Manual Download Page 37](http://html1.mh-extra.com/html/bender/atics-uma710-2-63-iso/atics-uma710-2-63-iso_manual_2731501037.webp)
Alle Rechte und Änderungen vorbehalten.
Subject to change without notice. All rights reserved.
© Bender GmbH & Co KG
UMA710-2-xx-ISO-xx, Manual.docx
Issued: 11.Jan.2016
37
8.2. Commissioning and service
For on-site commissioning of the changeover and monitoring module or switchgear systems by Bender
contact:
Bender GmbH
Londorferstr. 65
• 35305 Grünberg • Germany
Tel: +49 6401 807-0
• Fax: +49 6401 807-259
E-Mail: [email protected]
• www.bender-de.com
For the periodic verification of the changeover and monitoring module or switchgear systems by the Bender
Service department contact:
Service-Hotline:
0700-BenderHelp (Telefon and Fax)
8.3. Maintenance
The changeover and monitoring module does not contain any parts that require maintenance. Despite this,
the intervals specified for periodic verification should be adhered to.
We do recommend to check and tighten all terminal screws
(e.g. on the ATICS® unit, bypass switch,…)
when doing the periodic verification by skilled personnel.