![Bender ATICS-2-63A-ISO Manual Download Page 54](http://html1.mh-extra.com/html/bender/atics-2-63a-iso/atics-2-63a-iso_manual_2731578054.webp)
54
ATICS-2-ISO_D00046_04_M_XXEN / 03.2021
Operation
6.2.3.1 Test menu 1: IT system
IT system
Tests the integrated insulation monitoring device (insulation resistance, load
in %, overtemperature). The progress of the test is shown on the display.
Cancel
Return to test menu
Press the "ESC" button to leave the test function and then "Enter" to display the simulated measured
values. These are available alarm messages for a few seconds after the test. The messages from this test
are also stored in the history memory.
6.2.3.2 Test menu 2: Autom. changeover
Autom. changeover
Test of the changeover function. The device switches to the redundant line.
The changeover period t(1->2) is displayed. After the set time t(test) has
elapsed, the device switches back to the preferred line.
Cancel
Return to test menu
The date of the test is saved in the test logger to send a reminder for the next test once the test interval
has elapsed. The messages from this test are also stored in the history memory.
IT system
Cancel
IT system
228 V
50 . 0Hz
231 V
50 . 0Hz
12 : 23
Overtemperature
100%
12 0
Overtemperature
Addr. : 3 Chan.: 11
Test
3 / 3
Load
100%
Addr. : 3 Chan.: 10
Test
2/ 3
Addr. : 3 Chan.: 9
Test
1 / 3
Autom. changeover
Cancel
Autom. changeover
Test
t (1->2):
457ms
t (Test):
10s
Quit:
RESET
Summary of Contents for ATICS-2-63A-ISO
Page 10: ...10 ATICS 2 ISO_D00046_04_M_XXEN 03 2021 Intended use...
Page 12: ...12 ATICS 2 ISO_D00046_04_M_XXEN 03 2021 System description...
Page 21: ...ATICS 2 ISO_D00046_04_M_XXEN 03 2021 21 ATICS 2 63A ISO...
Page 41: ...ATICS 2 ISO_D00046_04_M_XXEN 03 2021 41 ATICS 2 63A ISO...
Page 82: ...82 ATICS 2 ISO_D00046_04_M_XXEN 03 2021 Troubleshooting...