![Bender A-Isometer IRDH 275 Operating Manual Download Page 10](http://html1.mh-extra.com/html/bender/a-isometer-irdh-275/a-isometer-irdh-275_operating-manual_2731572010.webp)
Safety information
10
1.4 Directions for installation
The terminals
and KE shall be connected by a separate wire to the pro-
tective conductor (PE). If the terminals L1, L2 of the device are connected to
a system under operation, the terminals
and KE must not be disconnect-
ed from the protective conductor (PE).
In order to check the proper connection of the device, it is recommended to
carry out a functional test using a genuine earth fault, e.g. via a suitable re-
sistance, before starting the A-ISOMETER
®
.
The devices, variant -4.. are delivered with the following factory setting:
Please check if the basic setting of the A-ISOMETER
®
complies with the re-
quirements of the system to be monitored.
Only one insulation monitoring device may be used in each intercon-
nected IT system.
When insulation or voltage test are to be carried out, the device shall
be isolated from the system for the test period.
ISO SETUP:
Alarm 1 / Alarm 2
(response values)
= 40 k
Ω
/ 10 k
Ω
ISO SETUP:
Operating principle K1/K2 = N/O operation
ISO SETUP:
Memory = off
ISO ADVANCED:
System leakage capacitance = 150
μF
COM SETUP:
Bus address = 3 (slave)
When an AC system includes galvanically connected DC circuits, the
following shall be considered:
Insulation faults in DC circuits can only be monitored correctly when
the rectifiers carry a continuous load of 5...10 mA.
Summary of Contents for A-Isometer IRDH 275
Page 6: ......
Page 18: ...Function 18 TGH1361en 11 2009...
Page 30: ...Connection 30 TGH1361en 11 2009...
Page 35: ...Operation and setting 35 TGH1361en 11 2009...
Page 72: ...Technical data IRDH275 B 72 TGH1361en 11 2009...
Page 75: ......