
3-1. Precautions for Installation
• Keep the equipment away from water.
• Keep in a circumstances safe from influence by temparature, humidity, wind, sun light, air containing
salts and minerals.
• Care about stability such as inclination, vibration and impact, including handling and transportation.
• Do not keep the equipment in a place where chemicals are or where gas is emitted.
• The floor construction required to safely support the chair and delivery system is 105 lbs./ft2
(500kg/m2 ) at minimum.
• During lifting and unpacking of the chair, make sure to hold only the designated parts.
• Do not drop or hit the chair.
• After the chair is unloaded from the palette and placed at the desired location, please make sure to
remove the shipping bolt with the red tag. Damage to chair may occur if shipping bolt is
not removed prior to chair operation.
• Do not connect to power supply other than AC120V 60Hz.
• Ground chair properly prior to turning power on.
• Chair base must be anchored to the floor for maximum stability.
• Refer to the installation manual of the chair and dental unit (if it is to be used) prior to, and
during installation.
• When the installation process has been completed, verify that all the mechanical and electrical
functions are working properly and that there is no evidence of oil leakage.
• Protective footwear and thick gloves are highly recommended at unpacking.
• Do not modify this equipment.
• In the case separation from any electrical poles is necessary, pull of the power plug from the power
supply outlet.
3-2. Required Tools
The following tools are necessary for installation of the chair.
Phillips screw driver #2
Allen key wrenches, metric size
3.
Introduction
- 3 -