
MAP/5 Hardware Replacement
C-24
Issue 4.0 October 1996
Figure C-12.
How to Remove the Battery on the System Board
3. Align the new chip with the dot positioned as shown in Figure C-12 and
press the chip into the socket.
You have completed this procedure.
Removing/Replacing the Second Hard
Drive or Mounting Bracket
You must remove the second hard drive housing or mounting bracket in order to:
■
Replace the power supply.
■
Replace any of the peripherals or drives in the drive housing or peripheral
bay including the hard disk drive, floppy diskette drive, and tape drive.
■
Install or replace the optional second hard drive.
DALLAS
real time
chip
DALLAS
REAL TIME
Chip
puller
Socket
Main
board
FRONT OF MAP/5
SIMM
sockets
Orientation
dot
Summary of Contents for Lucent Technologies INTUITY MAP/5
Page 1: ...INTUITY MAP 5 Hardware Installation 585 310 146 Comcode107856882 Issue 4 October 1996 ...
Page 11: ...Contents Issue 4 0 October 1996 xi ABB Abbreviations ABB 1 GL Glossary GL 1 IN Index IN 1 ...
Page 12: ...Contents xii Issue 4 0 October 1996 ...
Page 50: ...Getting Started 2 4 Issue 4 0 October 1996 Figure 2 1 How to Hold a Short Circuit Card ...
Page 76: ...Connecting Peripherals and Powering Up 3 20 Issue 4 0 October 1996 ...
Page 94: ...Getting Inside the Computer 5 10 Issue 4 0 October 1996 ...
Page 100: ...Installing Circuit Cards Introduction and Types 6 6 Issue 4 0 October 1996 ...
Page 104: ...Installing Tip Ring Circuit Cards 7 4 Issue 4 0 October 1996 ...
Page 138: ...Installing Optional Hardware 10 18 Issue 4 0 October 1996 ...
Page 146: ...Finishing Up 11 8 Issue 4 0 October 1996 ...
Page 150: ...Component Ordering Numbers A 4 Issue 4 0 October 1996 ...
Page 184: ...Cable Connectivity B 34 Issue 4 0 October 1996 ...
Page 266: ...Index IN 6 Issue 4 0 October 1996 ...