Issue 4.0 October 1996
3-1
This chapter describes:
■
‘‘Connecting the Keyboard and Monitor’’
■
■
‘‘Connecting the 7400A Data Module’’
■
■
‘‘Completing all Other Cabling’’
■
‘‘Connecting the System to the Power Supply’’
■
‘‘Accessing the CPU Setup Screens’’
!
CAUTION:
Do NOT cable the ethernet LAN card prior to powering up in order not to
disturb the customer’s existing LAN. In order for all other software to
function properly, all cable connections to peripherals, switches, networks,
etc. should be made prior to powering up the system.
3
Connecting Peripherals and
Powering Up
Summary of Contents for Lucent Technologies INTUITY MAP/5
Page 1: ...INTUITY MAP 5 Hardware Installation 585 310 146 Comcode107856882 Issue 4 October 1996 ...
Page 11: ...Contents Issue 4 0 October 1996 xi ABB Abbreviations ABB 1 GL Glossary GL 1 IN Index IN 1 ...
Page 12: ...Contents xii Issue 4 0 October 1996 ...
Page 50: ...Getting Started 2 4 Issue 4 0 October 1996 Figure 2 1 How to Hold a Short Circuit Card ...
Page 76: ...Connecting Peripherals and Powering Up 3 20 Issue 4 0 October 1996 ...
Page 94: ...Getting Inside the Computer 5 10 Issue 4 0 October 1996 ...
Page 100: ...Installing Circuit Cards Introduction and Types 6 6 Issue 4 0 October 1996 ...
Page 104: ...Installing Tip Ring Circuit Cards 7 4 Issue 4 0 October 1996 ...
Page 138: ...Installing Optional Hardware 10 18 Issue 4 0 October 1996 ...
Page 146: ...Finishing Up 11 8 Issue 4 0 October 1996 ...
Page 150: ...Component Ordering Numbers A 4 Issue 4 0 October 1996 ...
Page 184: ...Cable Connectivity B 34 Issue 4 0 October 1996 ...
Page 266: ...Index IN 6 Issue 4 0 October 1996 ...