
Preparing the Site
1-18
Issue 4.0 October 1996
Using a Breakout Box with the ACCX Card
Use the provided breakout box with each ACCX card installed to make either the
DCP or RS-232 connections. The box can be placed on the floor or attached to
the wall. The cable length allows placement up to ten feet (three meters) away
from the MAP/5. Each RS-232 connection requires a modem. See Appendix B,
‘‘Cable Connectivity’’, and Chapter 3, ‘‘Connecting Peripherals and Powering
Up’’, for information on how to connect modems and cables. See Figure 1-13 and
Figure 1-14.
Figure 1-13.
Making DCP Connections with a Break-Out Box
Summary of Contents for Lucent Technologies INTUITY MAP/5
Page 1: ...INTUITY MAP 5 Hardware Installation 585 310 146 Comcode107856882 Issue 4 October 1996 ...
Page 11: ...Contents Issue 4 0 October 1996 xi ABB Abbreviations ABB 1 GL Glossary GL 1 IN Index IN 1 ...
Page 12: ...Contents xii Issue 4 0 October 1996 ...
Page 50: ...Getting Started 2 4 Issue 4 0 October 1996 Figure 2 1 How to Hold a Short Circuit Card ...
Page 76: ...Connecting Peripherals and Powering Up 3 20 Issue 4 0 October 1996 ...
Page 94: ...Getting Inside the Computer 5 10 Issue 4 0 October 1996 ...
Page 100: ...Installing Circuit Cards Introduction and Types 6 6 Issue 4 0 October 1996 ...
Page 104: ...Installing Tip Ring Circuit Cards 7 4 Issue 4 0 October 1996 ...
Page 138: ...Installing Optional Hardware 10 18 Issue 4 0 October 1996 ...
Page 146: ...Finishing Up 11 8 Issue 4 0 October 1996 ...
Page 150: ...Component Ordering Numbers A 4 Issue 4 0 October 1996 ...
Page 184: ...Cable Connectivity B 34 Issue 4 0 October 1996 ...
Page 266: ...Index IN 6 Issue 4 0 October 1996 ...