
Replacing the Tape Drive
Issue 4.0 October 1996
C-41
Figure C-30.
Jumper Settings for the 525-Mbyte SCSI Cartridge
Tape Drive
Figure C-31.
Jumper Settings for the 2-Gbyte SCSI Cartridge
Tape Drive
6. Verify that terminator resistor strips are plugged into their sockets.
7. Slide the new tape drive in through the front of the peripheral bay.
The component side should be face down.
8. Secure the tape drive to the drive housing with the two screws removed
earlier.
9. Reconnect the large white power connector to the tape drive.
Rounded corners go down and the red wire should be on the right as you
face the back of the drive.
E5
E2
JP2
JP12
JP3
W1
E1
JP1
Located on bottom of disk:
RN1
SCSI
parity
SCSI
drive selection
2
1
0
Summary of Contents for Lucent Technologies INTUITY MAP/5
Page 1: ...INTUITY MAP 5 Hardware Installation 585 310 146 Comcode107856882 Issue 4 October 1996 ...
Page 11: ...Contents Issue 4 0 October 1996 xi ABB Abbreviations ABB 1 GL Glossary GL 1 IN Index IN 1 ...
Page 12: ...Contents xii Issue 4 0 October 1996 ...
Page 50: ...Getting Started 2 4 Issue 4 0 October 1996 Figure 2 1 How to Hold a Short Circuit Card ...
Page 76: ...Connecting Peripherals and Powering Up 3 20 Issue 4 0 October 1996 ...
Page 94: ...Getting Inside the Computer 5 10 Issue 4 0 October 1996 ...
Page 100: ...Installing Circuit Cards Introduction and Types 6 6 Issue 4 0 October 1996 ...
Page 104: ...Installing Tip Ring Circuit Cards 7 4 Issue 4 0 October 1996 ...
Page 138: ...Installing Optional Hardware 10 18 Issue 4 0 October 1996 ...
Page 146: ...Finishing Up 11 8 Issue 4 0 October 1996 ...
Page 150: ...Component Ordering Numbers A 4 Issue 4 0 October 1996 ...
Page 184: ...Cable Connectivity B 34 Issue 4 0 October 1996 ...
Page 266: ...Index IN 6 Issue 4 0 October 1996 ...