
Replacing the First Hard Disk Drive
Issue 4.0 October 1996
C-31
Figure C-17.
First 540 MB Hard Disk Drive Jumper Locations —
Version 1
NOTE:
This 540 MB hard disk is most likely to be the one you are removing and
NOT the one you are installing.
NOTE:
Jumper settings are different for each disk installed. The settings shown
here are for the first hard disk drive only which is installed in the peripheral
bay.
Check the second version of the 540 MB hard disk drive as shown in Figure
C-19. The primary difference is the number of jumpers.
JP1
*
*
*
*
*
*
*
JP2
JP5
JP4
J7
JP8
J6
(SCSI ID
settings)
Summary of Contents for Lucent Technologies INTUITY MAP/5
Page 1: ...INTUITY MAP 5 Hardware Installation 585 310 146 Comcode107856882 Issue 4 October 1996 ...
Page 11: ...Contents Issue 4 0 October 1996 xi ABB Abbreviations ABB 1 GL Glossary GL 1 IN Index IN 1 ...
Page 12: ...Contents xii Issue 4 0 October 1996 ...
Page 50: ...Getting Started 2 4 Issue 4 0 October 1996 Figure 2 1 How to Hold a Short Circuit Card ...
Page 76: ...Connecting Peripherals and Powering Up 3 20 Issue 4 0 October 1996 ...
Page 94: ...Getting Inside the Computer 5 10 Issue 4 0 October 1996 ...
Page 100: ...Installing Circuit Cards Introduction and Types 6 6 Issue 4 0 October 1996 ...
Page 104: ...Installing Tip Ring Circuit Cards 7 4 Issue 4 0 October 1996 ...
Page 138: ...Installing Optional Hardware 10 18 Issue 4 0 October 1996 ...
Page 146: ...Finishing Up 11 8 Issue 4 0 October 1996 ...
Page 150: ...Component Ordering Numbers A 4 Issue 4 0 October 1996 ...
Page 184: ...Cable Connectivity B 34 Issue 4 0 October 1996 ...
Page 266: ...Index IN 6 Issue 4 0 October 1996 ...