
Installing the System Board
Issue 4.0 October 1996
C-17
Installing the System Board
This procedure assumes that you have already removed the defective system
board. Complete the following steps to install the new board.
!
WARNING:
Observe proper electrostatic discharge precautions when handling
computer components. Wear a ground wrist strap on your bare skin and
connect to a ground.
1. Verify or set the jumpers. Refer to Figure C-8 and Figure C-9 for jumper
setting and locations.
Figure C-8.
System Board Jumper Settings
JP11
JP21
JPX1
JP22
JP12
JP13
JP14
JP15
JP1
JP3
JP5
JP7
JP2
JP10
JP4
JP6
JP8
JP24
JP23
JP20
Summary of Contents for Lucent Technologies INTUITY MAP/5
Page 1: ...INTUITY MAP 5 Hardware Installation 585 310 146 Comcode107856882 Issue 4 October 1996 ...
Page 11: ...Contents Issue 4 0 October 1996 xi ABB Abbreviations ABB 1 GL Glossary GL 1 IN Index IN 1 ...
Page 12: ...Contents xii Issue 4 0 October 1996 ...
Page 50: ...Getting Started 2 4 Issue 4 0 October 1996 Figure 2 1 How to Hold a Short Circuit Card ...
Page 76: ...Connecting Peripherals and Powering Up 3 20 Issue 4 0 October 1996 ...
Page 94: ...Getting Inside the Computer 5 10 Issue 4 0 October 1996 ...
Page 100: ...Installing Circuit Cards Introduction and Types 6 6 Issue 4 0 October 1996 ...
Page 104: ...Installing Tip Ring Circuit Cards 7 4 Issue 4 0 October 1996 ...
Page 138: ...Installing Optional Hardware 10 18 Issue 4 0 October 1996 ...
Page 146: ...Finishing Up 11 8 Issue 4 0 October 1996 ...
Page 150: ...Component Ordering Numbers A 4 Issue 4 0 October 1996 ...
Page 184: ...Cable Connectivity B 34 Issue 4 0 October 1996 ...
Page 266: ...Index IN 6 Issue 4 0 October 1996 ...