
Connecting Lucent Intuity Multi-Port Card to Customer
Equipment via a Modem
Issue 4.0 October 1996
B-23
Connecting Lucent Intuity
Multi-Port Card to Customer
Equipment via a Modem
Use the following procedure and illustration to make these connections.
1. Attach the 14-foot (4.3-meter) modular cable (provided with the card) to
the multi-port serial card.
2. Attach the other end of the 14-foot (4.3 meter) modular cable (provided
with the multi-port card) to the DTE adapter.
3. Connect the DTE adapter to the DCE modem.
4. Connect the DCE modem to customer equipment.
Figure B-17.
Connecting the Lucent Intuity Multi-Port Card to
Customer Equipment via a Modem
DTE
Adapter
DCE
Modem
14’
modular
cable
(provided)
Customer
equipment
(dial-up)
Multi-port
circuit card
MAP/5
Summary of Contents for Lucent Technologies INTUITY MAP/5
Page 1: ...INTUITY MAP 5 Hardware Installation 585 310 146 Comcode107856882 Issue 4 October 1996 ...
Page 11: ...Contents Issue 4 0 October 1996 xi ABB Abbreviations ABB 1 GL Glossary GL 1 IN Index IN 1 ...
Page 12: ...Contents xii Issue 4 0 October 1996 ...
Page 50: ...Getting Started 2 4 Issue 4 0 October 1996 Figure 2 1 How to Hold a Short Circuit Card ...
Page 76: ...Connecting Peripherals and Powering Up 3 20 Issue 4 0 October 1996 ...
Page 94: ...Getting Inside the Computer 5 10 Issue 4 0 October 1996 ...
Page 100: ...Installing Circuit Cards Introduction and Types 6 6 Issue 4 0 October 1996 ...
Page 104: ...Installing Tip Ring Circuit Cards 7 4 Issue 4 0 October 1996 ...
Page 138: ...Installing Optional Hardware 10 18 Issue 4 0 October 1996 ...
Page 146: ...Finishing Up 11 8 Issue 4 0 October 1996 ...
Page 150: ...Component Ordering Numbers A 4 Issue 4 0 October 1996 ...
Page 184: ...Cable Connectivity B 34 Issue 4 0 October 1996 ...
Page 266: ...Index IN 6 Issue 4 0 October 1996 ...