
Universal
Fiber
Express
®
Brilliance
®
900 µm INSTALLATION INSTRUCTIONS
LC-SC-ST
2
4
Clean fiber.
3
Strip off 24 ± 2 mm of buffer.
Slide activator tab to the
open position (towards ferrule).
9
8
Create and maintain a bow
with the fiber, while sliding
the activator tab to the closed position
(towards boot).
7
Insert fiber into connector up to the 13
mm buffer mark.
6
Mark buffer at 13 mm.
5
Align the end of the fiber’s buffer at 8
mm and cleave.
1
Slide boot onto fiber.
10
11
To watch a video of
this installation, visit
youtube.com/beldenvid
900 µm Buffered Fiber
(To Scale)
90
0 µm
Bu
ffered Fibe
r
8
+0
.5
-0
.0
13
50
40
30
20
10
0 mm
90
0 µm
Bu
ffered Fibe
r
8
+0
.5
-0
.0
13
50
40
30
20
10
0 mm
Do not
turn on VFL light source until
fiber is seated and activator tab is
closed. Light from VFL window has no
meaning until activator tab is closed.
Multimode -
Light goes out.
Singlemode -
Light dims. *
*
When using a Visual Fault
Locator (VFL) during termination
Install boot onto connector.
For complete details on this
procedure refer to Istallation
Guide PX105234.
*When using a Visual
fault Locator (VFL) during
termintation.
**When using a field cleaver
remove 40 mm of buffer.
A copy of the Guide is supplied
with each installation kit or visit
www.belden.com