Development Kit for EES20 and EES25
7
Release 1.0 03/2012
1 Hardware set up
These steps, as described in detail, are used to set up the Hirschmann
hardware:
□
Check Kit Contents
□
Plug the EES 20/25 Series into baseboard.
□
Apply power to the EES baseboard
□
Connect the Module
1.1 Check Kit Contents
Item
Quantity in Development Kit
Development board
1x Baseboard
Note: The EES Module is not
included
Product-CD
1x
1.2 Plug the EES 20/25 Series into development board.
Plug the EES 20/25 Series module into the sockets on the top of the
baseboard (CO103–CO101) as seen above.