TOP WHEEL
Mix and Match
28
Belanger, Inc. * 1001 Doheny Ct. * Northville, MI 48167 * Ph (248) 349-7010 * Fax (248) 380-9681
1MANUL749
Installation
Frame Assembly
Tunnel Placement Overview
As stated earlier, tunnel depth placement will vary from site to site. The images below show the
correct side-to-side placement.
Note:
The image below is shown with the Over-Under Conveyor option. Your
system may have the standard Guide Rails. Placement is the same for both.
Note:
The 45” (1.14 m) dimension is taken from the outside driver side leg base
plate, to the inside guide rail.
Floor
45”
(1.14 m)
Direction
of Travel
Summary of Contents for Top Wheel Mix & Match
Page 1: ...Top Wheel Mix Match 1MANUAL749 Rev12 Top Wheel Mix Match ...
Page 2: ......
Page 79: ......
Page 80: ......