Installation
Placement
The ICC houses all electrical, water, and chemical utility requirements and should be located and
mounted as soon as possible to allow the contractors to get their work done.
1) Position the ICC according to your specific floor plan.
Note:
The ICC as it is shipped from Belanger is not watertight and should be protected from
exposure to water.
2) When it is properly positioned, square and level it. Lag the ICC to the wall.
!!IMPORTANT!!
DURING THE INSTALLATION PROCESS THE INSTALLER IS RESPONSIBLE
FOR RE-TIGHTENING ALL LUGS, SET SCREWS AND TERMINALS LOCATED
IN THE ELECTRICAL PANELS. COMPONENTS MAY VIBRATE LOOSE
DURING SHIPPING.
WARNING
–
ELECTRICAL PANEL SHOULD BE MOUNTED SO THAT THE
DISCONNECT HANDLE IS BETWEEN 0.6
–
1.99 m (24
”
–
78
”
) IN HEIGHT ABOVE
THE FLOOR WITH THE IDEAL HANDLE HEIGHT BEING 1.7 m (67
”
). LOCAL
COMPLIANCE FOR HANDLE HEIGHT MUST BE CONFIRMED.
ICC Shown Below Has Optional Valves and Pumps
WARNING
–
MINIMUM SERVICE CLEARANCE OF 900 mm (35.5
”
) IS REQUIRED
IN FRONT OF ICC CONTROLLER ENCLOSURE DOOR. LOCAL COMPLIANCE OR
SITE CONDITIONS MAY INCREASE THIS DISTANCE.
CAUTION
–
THE IP RATING OF THAT CABINET MUST BE MAINTAINED. FOR
EXAMPLE, USE ONLY STRAIN RELIEFS WITH AN IP RATING OF 66 OR BETTER.
CAUTION
–
ALL CONNECTIONS MADE TO THE ICC ENCLOSURE MUST BE MADE
THROUGH THE BOTTOM OF THE ENCLOSURE. HOLES ARE NOT PRE-PUNCHED.
Summary of Contents for insta-KLEEN
Page 1: ...insta KLEEN System 1MANUAL334 Rev08 insta KLEEN System ...
Page 2: ...1MANUL334 REV 07 ...
Page 4: ......
Page 6: ......
Page 86: ......
Page 87: ......
Page 88: ......