Installation
Optional In-Ground Conveyor (North American Option)
Flush and Startup procedure
1) Disconnect all power to the Hydraulic Unit.
2) Fill the Hydraulic Reservoir with any of the approved fluids and fill case drain if applicable on the
10HP, 15HP and 20HP units.
3) Disconnect all devices such as hydraulic motor hoses and connect the lines together to by-pass
the motor.
4) Connect all feed lines and disconnect all return lines at the Hydraulic Unit and place in a bucket
for draining.
5) Close all flow controls and verify proper voltage and wiring.
6) Bump the Motor Starter to verify proper motor rotation.
7) Start the Hydraulic Unit and open each flow control until the fluid that comes out of the return
hoses is clean.
8) Reconnect all motors and return lines.
9) Start the Hydraulic Unit and check for proper Conveyor movement and correct rotation of all side
wheels.
10) Adjust speeds for each component according to the individual component manuals.
Summary of Contents for insta-KLEEN
Page 1: ...insta KLEEN System 1MANUAL334 Rev08 insta KLEEN System ...
Page 2: ...1MANUL334 REV 07 ...
Page 4: ......
Page 6: ......
Page 86: ......
Page 87: ......
Page 88: ......