insta-
KLEEN™ MANUAL
22
Belanger, Inc. * PO BOX 5470 * Northville, MI 48167-5470 * Ph (248) 349-7010 * Fax (248) 380-9681
1MANUL334
Installation
Guide Rails
8) Locate and identify the four the Transition Elbows shown below and secure them on the ends of
the Guide Rails using the supplied 1-
1/2” (38.1mm) fasteners and locking nuts as shown below.
The entrance elbows are mounted on an angle and the exit elbows are mounted straight.
Entrance Driver Side
Entrance Passenger
Side
Exit Driver Side
Exit Passenger Side
Exit End Elbows
Entrance Driver Side
Elbow
Entrance Passenger Side
Elbow
9) After the Transition Elbows are installed grind the Plastic Guide Rail (plastic of the Guide Rails) to
match the shape of the transition plate as shown below.
Grind here on
both entrance
sections to create
a smooth
transition onto
the Y-Section
Summary of Contents for insta-KLEEN
Page 1: ...insta KLEEN System 1MANUAL334 Rev08 insta KLEEN System ...
Page 2: ...1MANUL334 REV 07 ...
Page 4: ......
Page 6: ......
Page 86: ......
Page 87: ......
Page 88: ......