insta-KLEEN
™ MANUAL
1MANUL334
Belanger, Inc. * PO BOX 5470 * Northville, MI 48167-5470 * Ph (248) 349-7010 * Fax (248) 380-9681
21
Installation
The stanchions are to be installed on the exit section of the
Guide Rail at the 4 locations shown in the side image.
1) Remove the button-head screw and nut shown below. Discard the nut.
Loosen the lag bolt shown in image #2 to allow you to slightly lift the
Guide Rail off the floor. Locate the supplied support stanchion.
2) Slide the stanchion into place as in image #3 and replace the button-
head screw into the tapped hole in the stanchion (image #4). Secure
the stanchion to the floor with 1/2” (12.7mm) lags (image #5).
Image #1
Image #2
Image #3
Image #4
Image #5
Summary of Contents for insta-KLEEN
Page 1: ...insta KLEEN System 1MANUAL334 Rev08 insta KLEEN System ...
Page 2: ...1MANUL334 REV 07 ...
Page 4: ......
Page 6: ......
Page 86: ......
Page 87: ......
Page 88: ......