insta-
KLEEN™ MANUAL
20
Belanger, Inc. * PO BOX 5470 * Northville, MI 48167-5470 * Ph (248) 349-7010 * Fax (248) 380-9681
1MANUL334
Installation
Guide Rails
Helpful Hint
The following procedures requires field fabrication
1) Locate the supplied Guide Rail FIXTURE CLAMP (part #102941) as shown below.
2) Secure the clamp into the first hole position and drill down through the center hole on the fixture
as shown below using a 13/32 (10.32mm) drill bit. This will produce properly aligned holes in the
plastic for the supplied 3/8-16 x 1-
1/4” button-head fasteners and 3/8-16 center-lock nuts on the
underside of the guide rail.
Install fasteners in sequence down the rail to prevent the plastic from moving on the angle
and causing hole-misalignment.
3) Repeat this process until all plastic pieces are in place and secure. Tighten the nut and bolts down
as you work your way down the conveyor. This will minimize bowing of the plastic due to
temperature changes.
Note:
Make sure the seams are tight as you work your way down the conveyor.
Drill down through hole here
1FSTNR-BH510:
Button-Head Fastener
1NUT-CL375:
Center-Lock Nut
Summary of Contents for insta-KLEEN
Page 1: ...insta KLEEN System 1MANUAL334 Rev08 insta KLEEN System ...
Page 2: ...1MANUL334 REV 07 ...
Page 4: ......
Page 6: ......
Page 86: ......
Page 87: ......
Page 88: ......