Behlen Country AHW30 Technical Information Download Page 1

F-19906-13 

TECHNICAL INFORMATION 70112 

 

Rev. 1-10-19   8-15-02

Poly Electric Drinkers

(Models AHW30, AHW60, AHW80, AHW250)

CUSTOMER SERVICE CENTER

PO Box 569

Columbus, NE

68602-0569

Ph: 800-447-2751

Fax: (402) 563-7447

www.behlencountry.com

THANK YOU FOR PURCHASING THIS PRODUCT

Behlen Country has been in the business of providing quality products for more than 80 years.  

Our products will provide many years of service when maintained by the owner and used in 

accordance with the capabilities of the product.  For questions about this product, or for parts 

inquiries, please contact our Customer Service Center listed below.

Before beginning, read instructions thoroughly 

and inspect parts listing to insure that all parts 

have been included.

Preparation of Location:

Install drinker on a 4” (minimum) thick concrete 

base, slightly raised for better drainage. Before 

pouring concrete, have the water and electricity 

connected up through a 4” or larger tile for 

fi

 nal 

connections to the drinker. Be sure the edge 

of the tile is slightly raised above the concrete 

(approx. 1-1/2”) so that water drainage does not 

go into the open tile. The tile must be left open 

to give access to warmer air below the frost line, 

thus preventing the riser from freezing. Be sure 

the riser pipe does not touch the sides of the 

tile. 

Note:

 The concrete pad should be at least 

4” larger than the poly drinkers on all sides.

Model       Min. Pad Size  

   A      B

AHW30 

30” x 30”  

    - 

    -

AHW80  

25” x 36”  

27.5”   16.5”

AHW60  

25” x 36”  

27.5”   16.5”

AHW250 

40” x 36” 

33.0”  28.0”

Place the drinker in the desired position and 

drill 3/8” dia. x 1-1/2” (min.) deep holes, in 

the concrete using the molded-in hold down 

tabs at the base of the drinker as a guide. Cut 

the proper size hole in the 1” insulation board 

to 

fi

 t over the riser tile. It is important to use 

this insulation board to help insulate and seal 

the bottom of the drinker. Enough 1” x 3/8” 

weatherstrip is included with your drinker to seal 

the bottom of the drinker to the concrete base 

and also to seal the 

fl

 oat cover to the drinker. 

Put weatherstrip on the bottom of the drinker 

where it contacts with the concrete base. If there 

are any gaps bigger than 3/8”, two layers of 

weatherstrip can be put together to 

fi

 ll the gap. 

Please refer to the sketch in these sheets for 

proper placement of weatherstrip on the 

fl

 oat 

cover.  Secure the drinker using 3/8” x 1-7/8” 

expandable anchor bolts (purchased locally).  

Water Line: 

For connection of the drinker to the riser pipe, 

a high pressure ¾” I.D. hose is supplied with 

the drinker. A shut off valve which is easily 

accessible should be used at each drinker. If 

the drinker is to be shut down for the winter, a 

Shut-off Kit (Item No. 54130168) that drains the 

riser pipe to prevent freezing is available. The 

supply line should be 

fl

 ushed before drinker 

is connected. 

NOTE: 

Your drinker is equipped 

with a valve that is easy to clean and adjust. If 

low water pressure conditions exist and a higher 

fl

 ow rate is desired, a larger inlet is available 

(54300968) to increase the 

fl

 ow. (For hookup 

instructions see Technical Information 70131).

Electrical Connections 

 

(for AHW30, AHW60, 

AHW80 & AHW100 models only):
NOTE:

 Electrical connections should be made 

by a quali

fi

 ed electrician. The black wire from 

the power supply must be connected to the 

thermostat and the white wire from the supply 

connected to the white wire on the heating pad. 

The grounding wire from the supply must be 

connected to the terminal in the electrical box of 

the drinker.
The unit must be properly grounded to the 

supply box and fused properly. The fuse size 

is indicated on the red ground instruction tag. 

Summary of Contents for AHW30

Page 1: ...e hole in the 1 insulation board to fit over the riser tile It is important to use this insulation board to help insulate and seal the bottom of the drinker Enough 1 x 3 8 weatherstrip is included with your drinker to seal the bottom of the drinker to the concrete base and also to seal the float cover to the drinker Put weatherstrip on the bottom of the drinker where it contacts with the concrete ...

Page 2: ...esult in loss of livestock severe personal injury or even death Adjustment Adjust the float to maintain a water level in the trough of 1 to 1 below the top of the trough Warranties All Behlen Country Electric Drinkers carry a 5 year limited warranty on the body and a 1 year limited warranty on valves and controls DRINKER MOUNTING LOCATION FOR AHW30 DRINKER MOUNTING LOCATION FOR AHW60 AHW80 AHW250 ...

Page 3: ... to the valve be sure to attach the arm to the correct side of the valve The grooves on the valve and float arm must match Please note that the valve has coarse grooves on one side and fine grooves on the other The fine grooved side is used with the float arm see below for details To adjust the water level in the drinker loosen the thumb screws and position the float and arm so that the valve is t...

Page 4: ...ck for air gaps against wind penetrations Make sure the fountain is sealed from wind between the concrete platform and bottom of the drinker Make sure there are no leaks around the access door Make sure that the latches are holding the float cover securely to drinker If the latches are loose adjust spring tension on the latch and if necessary bend the latch ends in vise thus enabling the latches t...

Page 5: ...TEP 2 Clean the Rubber Seal in the Plunger and opening to the Valve of any mineral deposits or dirt buildup that may be obstructing the normal operation of the Valve Rubber Seal is inserted inside Plunger Rubber Seal Plunger Upper Arm Plunger w seal Cover Pins STEP 1 Slide off Cover pivot Upper Arm up and remove the Plunger Upper Arm Lower Arm Pins STEP 4 Replace the Plunger with the nipple facing...

Reviews: