![Bedford B503DSL Series Instruction Manual Download Page 32](http://html.mh-extra.com/html/bedford/b503dsl-series/b503dsl-series_instruction-manual_2719965032.webp)
28
9 THE PHYSICAL WIRING DIAGRAM
Appendix
:
1. B503DSL 2001
,
2002
,
2003 Wiring Diagram as below shown
The notes below should be considered for the AC debug
Power On Sequencing:
Disconnect Q2 firstly, and then wait at least 5 minuets until controller discharge (or
digital LED and all indicators extinguish ), then close Q1. Otherwise, will cause the
damage of controller.
Notice
:
When need to transform the power supply mode from power frequency to photovoltaic
cell; you only need to turn off “Q1”firstly and then close “Q2”.