![Beckman Coulter UniCel DxC Synchron 600 Instructions For Use Manual Download Page 328](http://html.mh-extra.com/html/beckman-coulter/unicel-dxc-synchron-600/unicel-dxc-synchron-600_instructions-for-use-manual_2719768328.webp)
As-Needed/As-Required Maintenance
Replacing the CO
2
Membrane
Maintenance
UniCel DxC Systems Instructions For Use A13914
Page 10-82
October 2005
Preparing the New CO
2
Measuring Electrode Membrane
Step
Action
1
Using tweezers, remove a new membrane (P/N 661750) from package in
the Maintenance Kit. Rinse the membrane thoroughly, on both sides, with
deionized water. Gently dry the membrane with lintless tissue.
Note: Use the packaged membranes that are separated by pink spacers.
Figure 10.56
2
Place the membrane clamp (2) on a flat surface. Using tweezers, carefully
center the membrane (1) on top of the membrane clamp.
Figure 10.57
(1 of 3)