![Beckman Coulter UniCel DxC Synchron 600 Instructions For Use Manual Download Page 301](http://html.mh-extra.com/html/beckman-coulter/unicel-dxc-synchron-600/unicel-dxc-synchron-600_instructions-for-use-manual_2719768301.webp)
Six-Month Maintenance
Replace Calcium and Potassium Electrode Tip
UniCel DxC Systems Instructions For Use A13914
Maintenance
October 2005
Page 10-55
10
Six-Month Maintenance
Replace Calcium and Potassium Electrode Tip
The following procedures apply to the preparation and replacement of calcium and
potassium electrodes that are housed in the flow cell. The operator may choose to
replace one or both electrode tips at the same time.
Step
Action
1
Pour ISE Reference Solution (do not dilute) into a small beaker or glass
container to a depth not to exceed two inches (50 mm).
2
Unpack a new potassium electrode tip (P/N 669117) (1) and/or a new
calcium electrode tip (P/N 467769) (2). Unpack each tip and carefully
remove the knurled protective cap (3) from membrane end of tip assembly.
Verify that the black protective cover on the internal threaded connector
end of the tip assembly is in place.
Figure 10.32
(1 of 2)