A13914AF
9-110
Maintenance
As-Needed/As-Required Maintenance
Wash the CC Reagent Cuvettes with CCWA
CC Reagent Wash All Cuvettes is an automated procedure that cleans all the cuvettes on the Reaction
Carousel using a cartridge filled with cleaning solution. This procedure should be performed on
dirty cuvettes that require additional washing beyond the Washing All Cuvettes procedure. This
routine takes approximately 38 minutes.
IMPORTANT
System does not autoprime in
Maintenance
mode. After completing a maintenance procedure,
or when a procedure is aborted, exit the Maintenance menu to resume autoprime and return the system
to
Standby
.
Materials Required:
•
CCWA cartridge (PN 657133)
1
Load the CCWA cartridge on the system.
•
Select:
—
Rgts/Cal
from the menu bar,
—
An empty chem position to load,
—
Load F1
.
2
Select:
•
Utils
from the menu bar,
•
2 Maintenance
,
•
9 CC Reagent Wash All Cuvettes
.
OR
Type
9
in the
Procedure No.
field and press
(
Enter
)
.
Follow all instructions on the screen.
3
Select
Continue
to perform the procedure.
You can exit this procedure at any time before it is completed.
•
To exit, select:
—
STOP
on the instrument; wait for system to finish processing,
—
OK
to clear message,
—
Cancel
to Exit the procedure screen,
—
Instr Cmd
from the menu bar,
—
1 Home
.
4
Select
Close
at the completion of this procedure to exit the
Result
pop-up window.
Summary of Contents for UniCel DxC 600
Page 4: ...A13914AF iv Revision History ...
Page 26: ...A13914AF xxvi Safety Notice Documentation Symbols ...
Page 36: ...A13914AF xxxvi Introduction How to Use this Manual ...
Page 132: ...A13914AF 3 34 System Setup Options Auto Generation of Control ...
Page 190: ...A13914AF 5 26 Quality Control Review Archived Data ...
Page 364: ...A13914AF 9 128 Maintenance As Needed As Required Maintenance ...
Page 384: ...A13914AF 10 20 System Status and Commands Unload All ...
Page 407: ......
Page 490: ...A13914AF Glossary 10 Glossary ...
Page 497: ......