Commissioning
76
───
Version: 2.1
eXtended Transport System
Prerequisites during op-
eration
•
Pay attention to atypical noise development
•
Pay attention to smoke development
•
Always check drive surfaces and cables for
dirt, leaks, moisture or dust
•
Check temperature development
•
Observe recommended maintenance intervals
•
Check function of safety devices
After operation
Ensure safe condition of the machine / system
Make sure that all movers come completely to a standstill.
If the controller enable is canceled or the 48 V power supply is
switched off, movers on a vertical section can move uncontrollably
and cause serious injuries.