Operation
EK1960
77
Version: 1.3.1
Fig. 82: Download Project Data – The Download Result dialog
Once the download is complete, the download results are displayed. Use the
Next
button to move to the next
dialog.
Fig. 83: Download Project Data – The Final Verification dialog
The locally calculated CRCs and the online CRCs of the safety project are displayed in the
Final Verification
dialog. They are automatically checked for equality and displayed via the column
Verification Result
. The
user must also check these data for equality and then confirm this by ticking the checkbox. Use the
Next
button to move to the next dialog.
Summary of Contents for EK1960 Series
Page 1: ...Operating Instructions for EK1960 TwinSAFE Compact Controller 1 3 1 2019 01 28 Version Date...
Page 2: ......
Page 6: ...Table of contents EK1960 6 Version 1 3 1...
Page 58: ...Operation EK1960 58 Version 1 3 1 Fig 51 Safety parameters of the input modules...
Page 140: ...Appendix EK1960 140 Version 1 3 1 5 2 Certificates...