background image

Installation Instructions 

 

 

 
 

Wiring diagram 

 

Wiring according to the wiring diagram (the circuit of PC_ON and Power-
Status is symbolical): 

Wiring diagram external 
switch and power supply  

 

 

Connection of the Battery Pack and UPS Output 

 

Note 

Connection of the Battery Pack and UPS Output only in combination with 
integrated UPS (order option). 

 

16

 

 CP62xx 

Summary of Contents for CP62 Series

Page 1: ...Installation and Operating instructions for Economy built in Panel PC CP62xx Version 2 7 Date 2012 04 02...

Page 2: ...t and Unpacking 9 Transport 9 Unpacking 9 Installation of the PC in the control cabinet 10 Installation in a control cabinet wall 10 Earthing measures 10 Mounting of the Panel PC 11 Power Supply Conne...

Page 3: ...e PC 22 Help files 22 Troubleshooting 23 Fault correction 23 Beckhoff Support Service 24 Beckhoff branches and partner companies 24 Beckhoff Headquarters 24 Beckhoff Support 24 Beckhoff Service 24 App...

Page 4: ...ed by Beckhoff Automation GmbH Other designations used in this publication may be trademarks whose use by third parties for their own purposes could violate the rights of the owners Patent Pending The...

Page 5: ...als Risk of injury WARNING If you do not adhere the safety advise adjoining this symbol there is danger to life and health of individuals Hazard to individuals CAUTION If you do not adhere the safety...

Page 6: ...en switched off must be secured against being switched on again The Industrial PC s power supply unit must be supplied with 24VDC Do not open the power supply unit while voltage is applied CAUTION The...

Page 7: ...ser is familiar with all the functions of the software installed on the Industrial PC to which he has access National regulations depending on the machine type Depending on the type of machine and pla...

Page 8: ...RS232 which is brought to a 9 pin SUB D plug connector COM2 Touchpad or additional interface optional The serial interface COM2 is connected to the touchpad optional When the IPC is delivered without...

Page 9: ...cess to the drives and the battery Access to hard disk CF Card and battery After solving the knurled screw the cap can be removed and allows access to hard disk battery and CF Card Status LEDs Descrip...

Page 10: ...temperature make sure that moisture condensation does not form on or inside the device Prior to operation the unit must be allowed to slowly adjust to room temperature Should condensation occur a del...

Page 11: ...allation height it should be optimally visible for the user at all times The PC should not be exposed to direct sunlight When the unit is in its mounting position the ventilation openings must not be...

Page 12: ...PC cutout dimensions Mounting of the Panel PC Clamping levers Release clamping levers Insert the PC into the cutout Release the clamping levers with a No 2 5 Allen key Folding them out Turn the clamp...

Page 13: ...ltage In this case the PC shuts down via the battery However over time this reduces the service life of the battery The new Beckhoff power supply technology approach addresses this problem and now off...

Page 14: ...ched off in order to avoid total discharge of the battery For a detailed functional description please refer to section Connecting Power Supply Pin assignment of the connector The power supply and the...

Page 15: ...s specified for 16 A and can lift conductive cross sections until 1 5 mm2 Fitting the connector to the cable So the connector is fitted to the cable 1 Strip insulation from the cable ends Length of st...

Page 16: ...inverted i e the PC shuts down if the 24 V connection is live If the PC_ON input is NOT connected by the user the PC can be booted in the familiar way by connecting the supply voltage and shut down v...

Page 17: ...g diagram the circuit of PC_ON and Power Status is symbolical Wiring diagram external switch and power supply Connection of the Battery Pack and UPS Output Note Connection of the Battery Pack and UPS...

Page 18: ...to be connected Disconnect all the devices that are to be connected from the power supply Connect all the cables between the Industrial PC and to the devices that are to be connected Connect all data...

Page 19: ...tention When you have shut down the Industrial PC you have to switch off power supply for at least 10 seconds before rebooting the system After resetting power supply the PC will start booting automat...

Page 20: ...f the cursor to be overwritten The overwrite mode is cancelled by pressing the key again Print Print Screen prints a hard copy of a text screen on the printer Pause The Pause key stops the computer un...

Page 21: ...is displayed at the bottom edge of the display Einschub Streifen Einschub Streifen Einschub Streifen Einschub Streifen The function of the special keys above the display is also determined by the soft...

Page 22: ...uild in Panel PC Note For technical support contact Beckhoff Service Replacing the battery on the motherboard A used battery on the motherboard has to be replaced See also chapter Access to the drives...

Page 23: ...the driver CD provided Installation on the PC Installation To install the UPS driver software execute file Beckhoff_UPS_vx xx xx exe from the subdirectory of UPS from the CD provided on the Industrial...

Page 24: ...s Call Beckhoff Service Computer boots software starts but control does not operate correctly Cause of the fault is either in the software or in parts of the plant outside the Industrial PC Call the m...

Page 25: ...rstra e 5 33415 Verl Germany Phone 49 0 5246 963 0 Fax 49 0 5246 963 198 e mail info beckhoff com Beckhoff Support Beckhoff offers you comprehensive technical assistance helping you not only with the...

Page 26: ...9 33 Dimensions CP621x a b t A B C D CP6211 12 Display 372 2 342 2 58 358 2 328 2 67 32 5 CP6212 15 Display 430 4 403 59 416 4 389 86 5 33 CP6213 19 Display 508 4 463 67 494 4 449 116 2 33 Dimensions...

Page 27: ...sport and storage as in operation Suitable packaging of the Industrial PC can improve the resistance to impact during transport The ambient temperature during storage and transport must be between 20...

Reviews: