background image

 

Operating Instructions 

 

6525 

17 

Operating Instructions 

 

Please also refer to chapter 

General Notes.

 

 
 

Switching the Industrial PC on and off 

Switch on 

The Industrial PC does not have its own mains switch. The Industrial PC 
will start when the equipment is switched on, or when it is connected to the 
power supply. 
 

Shutting down and 
switching off 

When the plant is switched off, or when it is disconnected from its power 
supply, the Industrial PC will be switched off. 
 
Control software such as is typically used on Industrial PCs permits various 
users to be given different rights. A user who may not close software may 
also not switch the Industrial PC off, since data can be lost from the hard 
disk by switching off while software is running. 
 
 

 

Warning 

First shut down, then switch off the PC! 

If the Industrial PC is switched off as the software is writing a file to the 
hard disk, the file will be destroyed. Control software typically writes 
something to the hard disk every few seconds, so that the probability of 
causing damage by switching off while the software is running is very high. 
 

 

Warning 

When you have shut down the Industrial PC, you have to switch off power 
supply for at least 10 seconds before rebooting the system. 
After resetting power supply the PC will start booting automatically. 
 

 

First switching on and driver installation 

 

When you switch on the Industrial PC for the first time, the pre-installed 
operating system (optional) will be started. In this case, all the required 
drivers for any additional, optional hardware components ordered with the 
PC will already have been installed. 
 
If the PC was ordered without operating system, you have to install the 
operating system and the driver software for any auxiliary hardware 
yourself. Please follow the instructions in the documentation for the 
operating system and the additional devices. 

 

Summary of Contents for C6525

Page 1: ...Installation and Operating instructions for Built in Industrial PC C6525 Version 1 1 Date 2021 11 15...

Page 2: ......

Page 3: ...easures 9 Mounting of the Industrial PC 10 Power Supply Connection 11 Beckhoff power supply technology 11 Pin assignment of the connector 12 Fitting the cable 13 Material for assembling the connectors...

Page 4: ...ice 21 Beckhoff branches and partner companies 21 Beckhoff Headquarters 21 Beckhoff Support 21 Beckhoff Service 21 7 Assembly dimensions 22 8 Appendix 23 Technical data 23 Approvals 23 FCC Federal Com...

Page 5: ...the meaning of 443 BGB of the German Civil Code or a statement about the contractually expected fitness for a particular purpose in the meaning of 434 par 1 sentence 1 BGB In the event that it contain...

Page 6: ...of the equipment must first be switched off after which the Industrial PC can be uncoupled from the plant Pulling out the fieldbus connection plug uncouples the PC optional Items of equipment that hav...

Page 7: ...ible National regulations depending on the machine type Depending on the type of machine and plant in which the Industrial PC is being used there will be national regulations for the control of such m...

Page 8: ...hipset is given off directly to the surroundings View form the top Configuration The 6525 is a fanless Industrial PC with passive cooling and can hence be constructed completely without rotating parts...

Page 9: ...Network 10 100BASE T The RJ 45 connector X109 allows the PC to be connected to a 10 100BASE T Local Area Network LAN Network 10 100 1000BASE T The RJ 45 connector X110 allows the PC to be connected t...

Page 10: ...ations in temperature make sure that moisture condensation does not form on or inside the device Prior to operation the unit must be allowed to slowly adjust to room temperature Should condensation oc...

Page 11: ...m in order to ensure adequate ventilation of the PC Warning Extreme environmental conditions should be avoided as far as possible Protect the PC from dust moisture and heat The ventilation slots of th...

Page 12: ...Industrial PC with clamping levers For installation the Industrial PC proceed as follows Release clamping levers Insert the Industrial PC into the cutout Release the clamping levers with a No 2 5 Alle...

Page 13: ...e the PC shuts down via the battery However over time this reduces the service life of the battery The new Beckhoff power supply technology approach addresses this problem and now offers the user the...

Page 14: ...is switched off in order to avoid total discharge of the battery For a detailed functional description please refer to section Connecting Power Supply Pin assignment of the connector The power supply...

Page 15: ...nnector is specified for 16 A and can lift conductive cross sections until 1 5 mm2 Fitting the connector to the cable So the connector is fitted to the cable 1 Strip insulation from the cable ends Len...

Page 16: ...rules The PC_ON signal is inverted i e the PC shuts down if the 24 V connection is live If the PC_ON input is NOT connected by the user the PC can be booted in the familiar way by connecting the supp...

Page 17: ...ing according to the wiring diagram the circuit of PC_ON and Power Status is symbolical Wiring diagram external switch and power supply i Note The battery pack can only be connected when the Industria...

Page 18: ...connected from the power supply Connect all the cables between the Industrial PC and to the devices that are to be connected Connect all data transfer cables if present to the appropriate plug in rec...

Page 19: ...s the software is writing a file to the hard disk the file will be destroyed Control software typically writes something to the hard disk every few seconds so that the probability of causing damage by...

Page 20: ...aced according to the rules of the board manufacturer See also chapter Product Description Danger Danger of Explosion if battery is incorrectly replaced Replace only with same or equivalent type recom...

Page 21: ...led from the driver CD provided Installation on the PC Installation To install the UPS driver software execute file Beckhoff_UPS_vx xx xx exe from the subdirectory of UPS from the CD provided on the I...

Page 22: ...fully Setup settings are incorrect Other cause Check the setup settings Call Beckhoff Service Computer boots software starts but control does not operate correctly Cause of the fault is either in the...

Page 23: ...GmbH Eiserstra e 5 33415 Verl Germany Phone 49 0 5246 963 0 Fax 49 0 5246 963 198 e mail info beckhoff com Beckhoff Support Beckhoff offers you comprehensive technical assistance helping you not only...

Page 24: ...mbly dimensions 22 6525 Assembly dimensions Warning The assembly of the unit must take place with the orientation diagrammed here Industrial PC C6525 All dimensions are in mm rear view side view top v...

Page 25: ...are to be observed during transport and storage as in operation The shock resistance during transport can be improved by means of suitably packing the Industrial PC The ambient temperature during sto...

Reviews: