![Beckhoff AS2000 Series Operating Instructions Manual Download Page 60](http://html1.mh-extra.com/html/beckhoff/as2000-series/as2000-series_operating-instructions-manual_2719356060.webp)
Mechanical installation
60
───
Version: 2.2
AS2000
Machining of pre-drilled coupling hubs
WARNING
Do not exceed the permissible bore diameter
Do not exceed the maximum permissible bore diameter specified
in the Technical data.
If you exceed the maximum values, the coupling may break and
parts may be ejected. Flying parts can lead to serious or even fa-
tal injuries.
Adhere to the concentricity and axial run-out accuracies and do not
clamp to the hub bridges.
For customer-specific special solutions and changes to the coupling
hubs, contact our Applications Department. Beckhoff GmbH & Co.
KG accepts no liability for unapproved, unauthorized conversions
and modifications of the components.
8.3.2
Mounting
8.3.2
6
2
3
4
1
5
6
7
7
6
► Mount the coupling hubs 6 and 7 on the shafts 1 and 5
► Insert screws 2 and 4
► Position the elastomer ring 3
6
2
3
4
1
5
6
7
7
6
► Push coupling hubs 6 and 7 together and align
► Make sure that you adhere to the distance dimensions between
the coupling hubs as specified in the Technical data
► Tighten the screws to the torque specified in the Technical data
Summary of Contents for AS2000 Series
Page 1: ...Operating instructions EN AS2000 Stepper motors 2021 05 21 Version 2 2...
Page 2: ......
Page 79: ......