For PR+SMI
When employing springs/anti-lifting devices, we recommend the use of at least three; for
longer tubes, use three springs/anti-lifting devices per metre of barrel.
Lay the connecting cable
Lay the connecting cable up to the tubular drive, and fix The connecting cable and
any antennae must not project into the winding chamber. Cover any sharp edges.
Attention
If the allocation table for the SMI tubular drives is incorrect or not available, commission-
ing of the KNX/SMI actuator is not possible.
Connection to the programming unit
green/yellow
blue
brown
black
grey
green/yellow
blue
brown
black
grey
Programming button
Travel button
1 = direction switch
Attention
The programming unit is only designed for the commissioning, not for continuous opera-
tion.
Connect the wires of the tubular drive to those of the same colour in the programming unit (Item No. 4935 200 034 0) and switch
on the power supply.
11
Summary of Contents for L120/11C PS(+)SMI
Page 23: ...Declaration of conformity 23...
Page 24: ......