
Rev 1
Copyright © 2021 by BECCA Inc. All Rights Reserved.
BECCA Recycler Operators Guide Poster 831240
OPERATORS GUIDE
1) Safety
Before operating the BECCA SOLVENT SAVER™, read the Instruction Manual completely. All BECCA products are
..
engineered and manufactured to the highest performance standards and have been subjected to detailed testing
...
before shipment from the factory.
DANGER LABELS (1- 4) WARNING LABELS (5
– 8)
1
2
3 4
5 6
7 8
1. Presence of flammable vapors and solvents. 4. Wear Breathable Air during use 7. Wear solvent-proof rubber gloves.
2. No smoking or metal grinding nearby.
5. Observe warnings at all times. 8. Wear protective eyewear before use
3. Keep away from open flames.
6. Read the Instruction Manual carefully.
WARNING!
Read the Instruction Manual to become familiar with all aspects of the
equipment.
2) Operation
1. Before filling the Recycler, place a new Recycler Bag in the Tank. Make sure
the ring is firmly in the groove of the tank and fold the excess bag material
down over the ring.
2. Turn the Unloading Valve on the Recycler and
empty the contents of Gun Washer
‘Used Solvent‘
container into Recycler ½ to 1 inch below Recycler
Bag Ring.
3. Pour Paint waste into Recycler
– Make sure to stir
waste paint in Recycler bag to dilute the
concentration.
Add no more than 64 oz. of paint waste to a
3-gal unit.
Add no more than 128 oz. of paint waste to a
6-gal unit
Caution! Larger amounts of Paint will reduce the capabilities
of the unit. This is due to the large heat sink created by the
excess solid material.
4. The system will initially be set at 350 ºF for 4 hours. Adjustments (see
Operators Manual) to the time may be required depending on the types
of solvents, type of paint, the painter’s waste levels, and the desired
consistency of the Waste material.
5. Assure there is an empty metal container under the tube coming from
the Condenser.
WARNING!
Make sure the ground strap is attached.