On Load Thru Spray Bar
Loading thru spray bar is safest method for loading hot asphalt into a
wet or potentially wet tank. This method is also useful when it is
necessary to keep the material in the bar from freezing, as may occur
when handling paving grade
asphalt in cool weather. It is
slower than Method A, being
limited to approximately 150
gallons per minute.
a.
Connect feed hose
between Valve A and the
supply tank valve.
b.
On the Side Control Panel, select On Load Thru Spray bar Hose A.
c.
Pull on the Pump/Valves (red button) to actuate the E & K valves.
d.
Select Forward pump direction.
e.
Turn Manual Increase Speed clockwise ¼ turn or about 40-60
GPM.
Summary of Contents for BC-502/CRC
Page 1: ...INSTRUCTION MANUAL Model BC 502 CRC Asphalt Distributor ...
Page 42: ...BC 502 CRC 42 ...
Page 43: ...43 ...
Page 69: ...69 ...
Page 87: ...87 Stage 1 ...
Page 151: ...151 Figure 13 INNER WING ASSEMBLY Figure 14 HYDRAULIC SYSTEM ...
Page 152: ...152 Figure 15 REAR PANEL ASSEMBLY ...
Page 154: ...154 Figure 17 PUMBING AND VALVE ASSEMBLY ...
Page 156: ...156 Figure 19 PUMP DRIVE ASSEMBLY ...
Page 157: ...157 Figure 20 PRODUCT PUMP ...
Page 158: ...158 Figure 21 SIDE CONTROL BOX SCHEMATIC ...
Page 159: ...159 Figure 22 CAB CONSOLE SCHEMATIC ...
Page 160: ...160 Figure 23 VALVE BOX SCHEMATIC ...
Page 161: ...161 Figure 24 REAR CONTROL BOX SCHEMATIC ...
Page 162: ...162 Figure 25 REAR CONTROL BOX PROPANE SCHEMATIC ...
Page 163: ...163 Figure 26 HYDRAULIC LAYOUT ...
Page 164: ...164 Figure 27 HYDRAULIC SCHEMATIC ...